Learn: films, a glossary, articles and answers

Films

Short moments from the Vextrus films, with the words that go with each: the drawing rising into the Live Model, the QS checking the exceptions, three clicks to the line, every module reading one model, and the record that goes with the building.

A plan on the drawing rises, storey by storey, into the Live Model of the Building.

Articles

Each article opens with its answer, then the detail, in the words a QS uses on site and in the office.

The glossary

Every word Vextrus uses has one meaning, written in plain words with the answer first: the Live Model, the Element, the Trace, the measurement sheet, the Priced BOQ, the Rate Analysis, Rebar and the Revision, and every term around them.

Measured on a synthetic plan: slab panel S1 at grids 4 to 5 and A to B, grid to grid, 14 feet 6 inches by 11 feet 9 inches, 5 inches thick. Its line on the drawing is the panel’s edge on grid line A, between grids 4 and 5.
A synthetic example plan
123456ABCDS3S5S3S2S4S2S2S2S1S6S1S3S5S312'-0"13'-6"13'-6"14'-6"12'-0"65'-6"11'-9"15'-0"11'-9"38'-6"14'-6"11'-9"

The Measurement Line

Element
Slab panel S1
Nos
1
L
14'-6"
B
11'-9"
H
0'-5"
Quantity
70.99 cft

The figure is this plan’s own arithmetic.

Questions and answers

The questions people ask about Vextrus, answered once each: what it is, how it differs from an ERP or a BIM tool, which drawings it reads, AI and your data, the done-for-you service, pricing and markets.

In Vextrus, what is the difference between the Priced BOQ and the Estimate?

The Priced BOQ is the bill of quantities, item by item by trade, with a rate and an amount in ৳ on every item; the Estimate is the total cost of the Project. The Estimate adds preliminaries and site overheads, contingency and taxes to the Priced BOQ's direct cost, each layer shown. In Vextrus, Estimate means the total only.

Send us a drawing set. See every number traced.

Drawn once. Every number traced.