Schedule (4D): the building rises, pour by pour
What is Schedule (4D) in Vextrus?
Schedule (4D) in Vextrus puts dated Activities on the Elements of the Live Model, with pours as the spine, so the Building rises as the date moves. Construction Stages keep their order, overlapping where the work allows. Each pour shows the Hold Points still open and waits for a signed Pour Release.

What you do
The Planner generates the plan over the Project calendar. Read the Gantt and its critical path, the chain of Activities that sets the finish date; drag the as-of slider to watch the Building rise pour by pour; open a pour to see the Hold Points still open and its Pour Release.
Schedule (4D) · Gantt by Construction Stage
Synthetic example, not to time
| Construction Stage | State |
|---|---|
| PilingPiling | done, on the critical path |
| SubstructureSubstructure | done, on the critical path |
| 1st floor slab casting1st floor slab | cast, on the critical path |
| 2nd floor slab casting2nd floor slab | cast, on the critical path |
| 3rd floor slab casting3rd floor slab | cast, on the critical path |
| 4th floor slab casting4th floor slab | the next pour, on the critical path |
| 5th floor slab casting5th floor slab | planned, on the critical path |
| 6th floor slab casting6th floor slab | planned, on the critical path |
| Roof slab castingRoof slab | planned, on the critical path |
| MasonryMasonry | in progress |
| ServicesServices | planned |
| FinishesFinishes | planned, on the critical path |
| External worksExternal works | planned |
- Critical path
- Other Activities
- Done by the as-of date
Each floor's columns are poured before its slab.
Next pour · 4th floor slab
Hold Points2 still open
Pour Releasewaits for an engineer's Signature
What changes
You know which pour is not ready before the concrete is booked: each pour shows the Hold Points still open and waits for a signed Pour Release.
42% late
Next door in India, 779 of 1,873 central-government projects were running late.
How it works
The Planner generates the plan over the Project calendar: dated Activities, each on a set of Elements.
Pours are the spine: the plan is built around each pour of concrete. Construction Stages (piling, substructure, each floor’s slab casting, masonry, services, finishes, external works) keep their order, overlapping where the work allows.
The Gantt shows the critical path, the chain of Activities where any one running late moves the finish date; click a bar and its Elements light in the Live Model.
Drag the as-of slider: the Building rises, pour by pour, to that date.
Each pour carries its Hold Points, the conditions it must clear before concrete is placed, and shows which are still open.
The pour waits for its Pour Release: an engineer’s Signature, a person’s act, never automatic.
Each Construction Stage shows its Element count, and team roles see its ৳; Buyers see progress only.
Who uses it
Team roles see ৳ by Construction Stage. Buyers see progress only, never ৳. The Planner generates the plan; others read it.
Questions
What is 4D scheduling in construction?
4D scheduling joins a building's model to its programme, so every date shows what is built by then. In Vextrus, Schedule (4D) puts dated Activities on the Elements of the Live Model, the same Elements the Priced BOQ and Cost (5D) read, so the plan, the quantities and the cost by stage come from one model.
What is the critical path?
The critical path is the chain of Activities with no slack: if any one of them finishes late, the whole job finishes late. In Vextrus the Gantt shows the critical path, and clicking a bar lights the Elements its Activity works on in the Live Model.
What is a Hold Point before a pour?
A Hold Point is a condition a pour must clear before concrete is placed. In Vextrus each pour in the Schedule (4D) carries its Hold Points and shows which are still open, so the team sees which pour is not ready before the concrete is booked. The pour waits for a signed Pour Release.
Who signs the Pour Release?
An engineer, with a Signature: a person's act, never automatic, and enabled only for the assigned signer. Until it is signed, the pour shows its Hold Points and which of them are still open.
Who makes the plan in Vextrus?
The Planner generates the plan over the Project calendar, and the other roles read it. Each Activity sits on the Elements it works on, so when a Revision touches those Elements, the plan shows "Revision pending" until the QS confirms the change.
What can Buyers see of the schedule?
Progress only. A Buyer, invited as a Guest, sees the Construction Stages in order, planned and actual dates, the handover date and progress per stage on the Live Model, and never ৳ or another Buyer's data.