The Trace: now the number knows where it came from
What is the Trace in Vextrus?
The Trace in Vextrus is the link from any figure back to where on which sheet it was read, or to the Question that supplied it. A click on the Live Model goes straight to the drawing, the Element's own line lit. The figures of every module trace to the same root, so any number can be checked.
The Measurement Line
- Element
- Slab panel S1, 4-5/A-B
- Nos
- 1
- L
- 14'-6"
- B
- 11'-9"
- H
- 0'-5"
- Quantity
- 70.99 cft
The figure is this plan’s own arithmetic.
What you do
Click any figure. One click: how it was measured, its Measurement Lines on the measurement sheet. Two: that Element in 3D. Three: its own line lit on the sheet it was read from.

What changes
Any number you are shown can be checked against the drawing in three clicks: nobody has to take anyone's word. A total opens all its Measurement Lines; each one opens its own line on the sheet.
30%
30% of professionals surveyed say over half their project data is bad.
How it works
01 Start from any figure: a quantity, rate or amount in the Priced BOQ, a Budget cell in Cost (5D), a figure on the Project Summary.
02 Click one.
The measurement sheet opens, one row per Measurement Line: the Element, No. × L × B × H, the quantity in its unit, the deductions named, and the Measurement Rules that produced it.
03 Click two.
That Element opens in 3D, in the Live Model.
04 Click three.
The Element’s own line lights up on the sheet it was read from.
05 Where the drawing did not give a figure, the Trace opens the Question that supplied it, or names the rule that made it.
06 Read the basis label on every total.
It names the weakest state of its lines, ‘in part’ when they are mixed, the same on every screen.
The Measurement Sheet
A synthetic example: the slabs of the plan
RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)
| Element | Nos | L | B | H | Quantity (cft) |
|---|---|---|---|---|---|
| Slab panel S14-5/A-B, 4-5/C-D | 2 | 14'-6" | 11'-9" | 0'-5" | 141.98 |
| Slab panel S22-3/A-B, 2-3/C-D, 3-4/A-B, 3-4/C-D | 4 | 13'-6" | 11'-9" | 0'-5" | 264.38 |
| Slab panel S31-2/A-B, 1-2/C-D, 5-6/A-B, 5-6/C-D | 4 | 12'-0" | 11'-9" | 0'-5" | 235.00 |
| Slab panel S42-3/B-C | 1 | 13'-6" | 15'-0" | 0'-5" | 84.38 |
| Slab panel S51-2/B-C, 5-6/B-C | 2 | 12'-0" | 15'-0" | 0'-5" | 150.00 |
| Slab panel S64-5/B-C | 1 | 14'-6" | 15'-0" | 0'-5" | 90.63 |
| Stair and lift core: no slab (measured with the stair)3-4/B-C | 0.00 | ||||
| Total | 966.37 | ||||
Who uses it
Questions
Where did this number come from?
Click it, and Vextrus shows you. Every figure opens its Trace: the Measurement Lines that make it, the Element in 3D, then the Element's own line lit on the sheet it was read from. A figure the drawing did not give opens the Question that supplied it, or names the rule that made it.
What is a Measurement Line?
A Measurement Line is one line of the measurement sheet behind a BOQ Item: the Element, No. × L × B × H, the quantity in its unit, and the Measurement Rules that produced it. The sheet is in the BOQ's own units, feet and inches for L, B and H, metric one switch away, and each line opens its place on the drawing.
What does the basis label on a total mean?
It says how the total was found. Every figure is read (taken from the drawing, with a Trace), inferred (made by a named rule, the rule shown) or a placeholder (counted, no quantity yet). A total's label names the weakest state of its lines, 'in part' when they are mixed, the same on every screen: a sum is never stronger than its weakest part.
Does every module trace back to the drawing?
Yes. The Priced BOQ, Rebar, the Schedule (4D), Materials, Cost (5D) and every later module read the same Live Model, so their figures trace to the same root: the line on the drawing where it was read, or the Question or rule that supplied it. A Rebar figure says whether it is by ratio, from the drawing, or from the drawing plus rules.
Can a QS check a figure by hand?
Yes. Every quantity has a measurement sheet behind it, laid out the way a QS writes one: No. × L × B × H, the quantity in its unit, the deductions named. Each quantity is rounded in its unit as the Rule Set sets it, and the amount is that printed quantity times the rate, exactly, so every BOQ Item cross-checks by hand.