The Vextrus glossary

What is the Vextrus glossary?

The Vextrus glossary defines every word the product uses, from the Live Model, the Element and the Trace to the Priced BOQ, Rebar and the Journal. Each term has one meaning, in plain words, with the answer first. Every term has its own anchor, its related terms, and a link to its module or role page where one exists.

Synthetic plan
123456ABCDS3S5S3S2S4S2S2S2S1S6S1S3S5S312'-0"13'-6"13'-6"14'-6"12'-0"65'-6"11'-9"15'-0"11'-9"38'-6"

A

What is an Activity in Vextrus?

An Activity is dated work on a set of Elements in the Schedule (4D). The Planner generates the plan over the Project calendar, with pours as its spine and the Construction Stages in their order, overlapping where the work allows; a bar on the Gantt lights the Elements its Activity covers, and the Building rises in 4D by date.

What is an Apartment in Vextrus?

An Apartment is one sale item of a Project: the home a Buyer books and receives at handover. In Vextrus, Apartments are a view in the Project, the view Sales works from. The area the Developer sells is its Saleable Area, labelled as such and never mixed up with the Gross Floor Area.

What is the assumptions-and-gaps report?

The assumptions-and-gaps report is delivered with the Estimate. It records the notes on the drawings that name no Element, so they are kept rather than lost. Every exception in the Takeoff is fixed, ruled, sent to the RFI list or recorded in this report before an Estimate is issued, and every assumption stays a visible Rule Set parameter.

What is an Attribute in Vextrus?

An Attribute is a named fact an Element carries, such as its grade, its casting stage or its warranty. It is defined once as data per Element Family and Market, with values per Life Phase: As designed, As built and As maintained. A Developer may add its own Attributes, and a Record writes their built and maintained values.

B

Who is a Bank engineer?

A Bank engineer is the engineer a Developer's bank sends to follow a Project, and joins Vextrus as a Guest: invited by name, scoped to chosen Projects and read-only. A Bank engineer sees the Project Summary, the Live Model coloured by progress and the Priced BOQ, with quantities only and never money.

Vextrus for banks and bank engineers

What is a BBS?

A bar bending schedule (BBS) lists the Rebar of each structural Element: shape codes, laps and cut lengths. In Vextrus the bars are read from the drawing's callouts, laps, hooks and anchorage worked by rule where the drawing is silent. Every bar is checked against BNBC 2020; the Structural Engineer signs the BBS, and a later edit marks it stale.

What is the Benchmark Rate?

The Benchmark Rate is the PWD Schedule of Rates rate for an item it lists, shown beside the working rate as printed, net of PWD's mark-ups (profit, overhead and VAT). It is never the rate the Priced BOQ is totalled on, which comes from the item's Rate Analysis; a gap between them is a question the QS answers, labour included.

What is a Board Pack?

A Board Pack is what the MD takes from the Project Summary to the board, frozen as issued, so the figures the board saw stay as they were. Its cost figure is the Issued Estimate, with its issue number and date, which every later change is compared against, and each figure keeps its Trace.

What is a BOQ Item?

A BOQ Item is one line of the Priced BOQ: a description with its mix, grade and element class, a unit, a BOQ Section and a Trade. Its quantity is the sum of its Measurement Lines, rounded in its unit; its rate comes from its Rate Analysis; and its amount is that quantity times the rate, exactly.

What is a BOQ Section?

A BOQ Section is one building part the Priced BOQ is grouped by, in this order: Sub-structure, Super-structure, Masonry, Finishes, Doors & Windows, Services and External works. A BOQ Section is not a Trade: a Trade is a kind of work, and the same Priced BOQ can also be viewed by Trade.

What is the Budget in Vextrus?

The Budget is the money plan for building, cut in Cost (5D) from the Issued Estimate by Storey Band and Construction Stage; it names the Issued Estimate it came from, and each Budget cell opens to its Measurement Lines. The word belongs to cost control: the total cost is the Estimate, and the MD's figure is the Target Cost.

What is a Building in Vextrus?

A Building is one structure of a Project, with its own storeys, grid and Live Model. Most Dhaka Projects have one Building; a premium Developer's Project may have several, such as towers, a podium or a car park. A Building need not be a tower or a block, and its Gross Floor Area is measured from its own Live Model.

Who is a Buyer?

A Buyer is a person who buys an Apartment from the Developer, and joins Vextrus as a Guest. In the Buyer's progress view, a Buyer follows the Construction Stages in order, the planned and actual dates, the handover date and progress per stage on the Live Model; never money, and never another Buyer's data.

Vextrus for buyers

C

What is a Check in Vextrus?

A Check tests what was read, confirmed or priced against something independent of it: the source drawings (a schedule against its plan), a conservation (owned volumes sum to the whole; each item's labour paid once) or a sanity range (kg of Rebar per sft of floor, never the Rebar Ratio's estimate). A fired Check raises a Question or a flag.

What is a Confirmation in Vextrus?

A Confirmation is the QS's acceptance of the machine's Proposals: the exceptions one by one, and a whole type only when its cross-checks pass, its spot-measure matches and every exception group is settled. Only confirmed Elements enter the Live Model and the Priced BOQ. Every Confirmation is written to the Journal under the QS's name.

What is a Construction Stage?

A Construction Stage is one step in the order a Dhaka building is built and paid for: piling, substructure, each floor's slab casting, masonry, services, finishes and external works, overlapping where the work allows. The Material Schedule and the cost by stage are broken down by it. A Construction Stage is a sequence, not a date.

What is a convention card?

A convention card is one of a Drawing Set's own drafting conventions, shown with its drawing crop, its meaning ("this layer holds the columns") and the Elements and money that ride on it. The QS confirms it in one click, overrides that item, or asks through the RFI list. Every set is read on its own conventions.

What is Coverage in Vextrus?

Coverage is the account of every view on every sheet of a Drawing Set: assigned to the Takeoff Steps that read it, used by them, or excluded with a reason. Nothing is silently unread. The sheets found are checked both ways against the consultant's Drawing List, and a missing Discipline is a Question, never zero.

D

What is a Developer in Vextrus?

A Developer is a real-estate development firm that builds and sells residential or commercial buildings; it is Vextrus's first paying customer. Each Developer is its own tenant in Vextrus, and its data is its own, with row-level security per Developer. Inside the Developer, the MD buys Vextrus and the QS is the first daily user.

What is a Deviation in Vextrus?

A Deviation is an As built or As maintained value that differs from its As designed value beyond a tolerance. Vextrus shows a Deviation beside the design value and never absorbs it: the As designed value stays untouched, and the Record behind the Deviation names who wrote it, when, and on what evidence.

What is the Digital Twin in Vextrus?

The Digital Twin is what the Live Model becomes once the building's own data flows back into it after handover: every asset with its identity from the drawing, its warranty, its upkeep and its history. At handover the Live Model goes with the building; As maintained Records then land on the same Elements, so each asset keeps its history.

See the Digital Twin page

What is a Discipline in Vextrus?

A Discipline is one family of drawings in a Drawing Set: structural, architectural, one of the MEP Disciplines (electrical, plumbing and sanitary, fire, mechanical (HVAC), lift, gas) or general notes and specification. Each usually comes from its own consultant office and is revised separately, and each is read into its own Discipline Part of the Live Model.

What is a Discipline Part?

A Discipline Part is the part of a Building's Live Model read from one Discipline's drawings: Structural, Architectural, Electrical, Plumbing, Fire and the rest. Each has its own Revisions, Takeoff Steps, Element Families and Confirmations, and shares the Building's storeys and grid with every other Part. Element Relations link Elements across Parts.

What is the Drawing List?

The Drawing List is the consultant's list of a Drawing Set's sheets, read from a sheet of the set or pasted or typed by the QS, with its source shown. It gives the number of sheets expected, and Vextrus checks the sheets found against it both ways, so a missing sheet or an unlisted one shows.

What is a Drawing Set?

A Drawing Set is all the drawings issued for one Project, across its Buildings and Disciplines, as the files the consultant or team produced. Vextrus reads the set's 2D DWG drawings whole: the QS uploads the set once, it is sorted by Discipline, Structural first, and every sheet is accounted for. Consultants keep drawing in 2D.

E

What is Earned Value?

Earned Value is the Budget's value of the work actually done, set against the value of the work planned by the same date. In Vextrus, Cost (5D) reads it from the Live Model and the plan: what is built is the Site Engineer's Record on the Elements, not a scan, and the plan is the Schedule (4D).

What is an Element in Vextrus?

An Element is one confirmed thing in the Live Model with a stable identity across Revisions and Life Phases: a physical piece, the unit that is cast, inspected and maintained (a column or shear wall in one storey, a beam, a slab panel, a wall run, an opening), or a reference, such as a storey or a grid line.

What is an Element Family?

An Element Family is the kind of Element one Takeoff Step proposes and confirms, such as columns, beams, slabs or walls, with its own identity rule across Revisions. The machine drafts every Element Family in building order, and the QS reviews the draft type by type, in the same order, before any of it counts.

What is an Element Relation?

An Element Relation is a typed, checked link between two Elements, often in different Discipline Parts: hosted in, passes through, in room, spans storeys, or same thing as. When one end of an Element Relation changes or disappears, a Question is raised for the QS, so a change in one Discipline is asked about in the others.

What is the Estimate in Vextrus?

The Estimate is the total cost of a Project, its Buildings and its Site: the Priced BOQ's direct cost plus preliminaries and site overheads, contingency and taxes, each layer shown and editable by the Developer. In Vextrus the word means the total only; the bill of quantities, item by item, is the Priced BOQ.

G

What is Gross Floor Area?

Gross Floor Area is the area of every floor of a Building, basement and parking included, measured to the outside of the walls from the confirmed Live Model; Vextrus's fee is priced per sft of it. It is not the Saleable Area, the area the Developer sells, and Vextrus labels each area figure as what it is.

Who is a Guest in Vextrus?

A Guest is a person from outside the Developer, such as a consultant's engineer, a contractor's QS, a Buyer, a Land-owner or a Bank engineer, invited into its data by name, scoped to chosen Projects and time-bound where the Developer wants it. A Guest is read-only, acts under their own name, and never sees money.

H

What is a Hold Point?

A Hold Point is a condition a pour must clear before concrete is placed. In the Schedule (4D), each pour shows the Hold Points still open and waits for a signed Pour Release, which an engineer signs only when all have cleared, so the site knows which pour is not ready before the concrete is booked.

I

What is an Issued Estimate?

An Issued Estimate is a frozen snapshot of the Estimate: the Priced BOQ, the Material Schedule, the Market Price set, the Rule Set version and the Live Model's state, down to each Element's Measurement Lines, with an issue number and date. It is issued by a Signature, never automatically, and is the figure the MD takes to the board.

J

What is the Journal in Vextrus?

The Journal is the append-only, hash-chained record each Developer keeps in Vextrus: every run record, every Confirmation and every agent act, each under its own actor, and every signed Resolution as one line. Lines are only ever added, each chained to the one before, and a figure read from the Journal opens its Trace.

L

What is a Labour Contract?

A Labour Contract is the Developer's agreement with a labour-only contractor, priced per unit of its own scope: per cft of RCC, per sft of plaster, or per sft of casting area covering Rebar binding, shuttering and casting together. It is its own BOQ Item in the Priced BOQ, and each item it covers takes no other labour.

Who is a Land-owner?

A Land-owner is the owner of the plot a Project is built on, who joins Vextrus as a Guest: invited by name, scoped to that Project and read-only. A Land-owner sees the Project Summary, the Live Model and the Priced BOQ with quantities only, so the Building can be followed without its costs being seen.

Vextrus for land-owners

What is landed cost?

Landed cost is what a Resource costs delivered to site, not the price on the quote. In Materials, Vextrus ranks the quotes for a requisition by landed cost, because the cheapest quote is not always the cheapest price delivered, and the Purchase Order goes to the lowest landed cost, inside the MD's Standing Authority.

What is a Life Phase?

A Life Phase is the part of an Element's life an Attribute belongs to: As designed (from the drawings, Revisions and prices), As built (what was actually cast and spent on site) or As maintained (warranty, expected life and upkeep after handover). One Element keeps one identity through all three Life Phases.

What is the Live Model?

The Live Model is the building as one dataset of confirmed Elements, each with a stable identity, its geometry, its Trace, and its cost, construction and O&M attributes across its Life Phases. The Priced BOQ, the Material Schedule, the 3D and every later module are readings of it. Vextrus reads it from the Developer's 2D drawings, confirmed by the QS.

See the Live Model page

What is a Lump Sum?

A Lump Sum is a BOQ Item priced as one typed amount, with the unit LS and no Rate Analysis, such as a utility connection charge. A Lump Sum counts toward the Estimate but stays outside the Priced BOQ's measured subtotal. It is not a Provisional Sum, which is set aside for work whose scope is unknown.

M

What is a Market in Vextrus?

A Market is one country's (or region's) way of building, measuring, pricing and speaking, held as data in Vextrus: its currency, languages, number format, unit systems, Rule Set, rates, benchmark, taxes and Construction Stages. Bangladesh is the first Market. A Market is not the region where data is hosted, and not a locale.

What is a Market Price?

A Market Price is the Developer's price for one unit of a Resource on a date, kept in dated sets. It is the one place a price is changed, so every working rate and amount that uses it follows, while each Issued Estimate keeps the set of Market Prices it was issued on.

What is the Material Schedule?

The Material Schedule is the quantities of basic materials a Building needs (cement, sand, stone chips, Rebar by diameter, bricks and the like), by floor and by Construction Stage, derived from the same takeoff as the Priced BOQ. Wastage enters it, never a BOQ quantity, and Materials buys each pour's needs from it.

Who is the MD?

The MD is the Developer's managing director or director, who buys Vextrus. The MD reads the Project Summary, sets the Target Cost, picks the baseline of a Revision Comparison, signs Resolutions and takes the Issued Estimate to the board, and never edits the Takeoff. A Purchase Order outside the Standing Authority waits for the MD's Signature.

Vextrus for the Developer's MD

What are Measurement Lines?

A Measurement Line is one line of the measurement sheet behind a BOQ Item: the Element, No. × L × B × H, the quantity in its unit, and the Measurement Rules that produced it. A BOQ Item's quantity is the sum of its Measurement Lines, and each line opens its place on the drawing.

What is a Measurement Rule?

A Measurement Rule is one rule, written in words a QS reads, for turning the Live Model into a BOQ quantity: for example, deduct openings over 0.1 m² from brickwork. Every figure's Trace names the Measurement Rules that produced it, and the Measurement Rules a Developer measures by make up its Rule Set.

What is the measurement sheet?

The measurement sheet is the record behind every quantity in the Priced BOQ, in the form a QS already signs: one row per Measurement Line, No. × L × B × H, the quantity in its unit, the deductions named. Each line opens its place on the drawing, and can be added, deducted or edited with a reason.

What is a Mix in Vextrus?

A Mix is the proportion of cement, sand and aggregate in a concrete or mortar, such as 1:1.5:3 or 1:4, with its dry-volume factor. A Rate Analysis's material quantities follow from its Mix. A Mix is not a grade: the grade is the concrete's strength, and a BOQ Item's description names both.

P

What is a Point in Vextrus?

A Point is one electrical outlet counted and priced as PWD prices it: a light, fan, socket or similar outlet with its switch-board box, the switch priced apart. A Measurement Rule counts each outlet Element as a Point, so the electrical work enters the Priced BOQ from its own drawings.

What is the Pour Release?

The Pour Release is an engineer's Signature that lets a pour go ahead. In the Schedule (4D) it is enabled only when every Hold Point on the pour has cleared, and only for its assigned signer; it is never automatic. Each pour shows its open Hold Points and waits for it, so the site knows which pour is not ready.

What is the Priced BOQ?

The Priced BOQ is the bill of quantities for a Building, item by item by trade, with a rate and an amount in ৳ on every item; each quantity traces back to where it was read on the drawings. Its BOQ Items sit in seven BOQ Sections, each rate built from its Rate Analysis.

See the Priced BOQ page

What is a Project in Vextrus?

A Project is one Developer's development on one plot of land, sold and managed as one: its Site, one or more Buildings and one Drawing Set. In Vextrus the Project is the hub that holds its current sheets, its changes, the answers to its questions and its people in one place, with the Drawing List and every Thread.

See the Project page

What is the Project Summary?

The Project Summary is the MD's page for one Project: total cost and cost per sft, cost by trade and by floor, what is confirmed and what is open, the Rebar with its Rebar Basis, the latest Revision Comparison, the Live Model in 3D and the Target Cost warning. Every figure opens to its Elements and sheets.

See the Project Summary page

What is a Proposal in Vextrus?

A Proposal is what the machine has read or inferred for an Element or a fact, shown with its Trace and waiting for the QS. A Proposal counts toward nothing until the QS confirms it. The machine proposes, the engine measures and the QS confirms, so no Proposal enters the Live Model or the Priced BOQ on its own.

What is a Provisional Sum?

A Provisional Sum is an amount set aside for work whose scope is unknown when the Priced BOQ is drawn up, shown at the end of the BOQ Section it provides for and kept outside the measured subtotal. A Provisional Sum is not a contingency, which is a layer of the Estimate, and not a Lump Sum.

What is a Purchase Order?

A Purchase Order is the order that buys a Resource from a dealer, placed in Materials once the quotes for a requisition are ranked by landed cost. Procurement places a Purchase Order inside the MD's Standing Authority; one outside it waits for the MD's Signature. Each pour's needs come from the Material Schedule.

Q

Who is the QS?

The QS is the quantity surveyor or estimation engineer, at the Developer or working for it, who measures quantities from drawings and prices them; the first daily user of Vextrus. In Vextrus the QS confirms each set's conventions, verifies the drafted model by exception, rules once per issue type, prices the Priced BOQ and issues the Estimate.

Vextrus for the QS

What is a Question in Vextrus?

A Question is a fact the machine could not read, or found in conflict, asked of the QS at the point of need and answered once for every Element it unblocks. A missing Discipline is a Question, never zero, and where no published standard gives a Rule Set's starting value, the QS answers one Question per Building.

R

What is a Rate Analysis?

A Rate Analysis is the breakdown of one BOQ Item into the Resources it consumes per unit. Priced at the Developer's Market Prices, it gives the item's working rate, and summed over the Building it gives the Material Schedule. Where the PWD Schedule of Rates lists the item, its Benchmark Rate stands beside the working rate, never in its place.

What is Rebar?

Rebar is the steel bars that reinforce RCC, bought by the ton and scheduled by diameter; it is Vextrus's one word for them on every screen and document. Vextrus reads Rebar from the structural drawing's callouts into a bar bending schedule (BBS), checks every bar against BNBC 2020, and the Structural Engineer signs. Vextrus does not design the Rebar.

See the Rebar page

What is Rebar Basis?

Rebar Basis is how an Element's Rebar was found, shown on every Rebar figure: by ratio (from a Rebar Ratio), from the drawing (every bar, lap and hook stated) or from the drawing + rules (laps, hooks, anchorage, cutting and Wastage by rule where the drawing is silent). The Priced BOQ's Rebar stays net: Wastage enters the Material Schedule.

What is a Rebar Ratio?

A Rebar Ratio is the kg of Rebar per unit volume of concrete for an Element type, by Storey Band where the QS sets it, from Vextrus's defaults or the Developer's QS. It gives an Element its Rebar, with an assumed diameter split, until the bars are read, labelled by ratio; kg per sft of floor is only a Check.

What is a Record in Vextrus?

A Record is the dated act that writes an As built or As maintained value of an Attribute, naming who, when and on what evidence, and it never changes an As designed value. What is built is the Site Engineer's Record on the Elements, not a scan, and at handover the Records go with the Building on the same Elements.

What is a Resolution in Vextrus?

A Resolution is a Thread's resolved outcome, signed by a named person. It states what was agreed on the Element or sheet region the Thread is pinned to, and it lands as one line in the Journal. The MD signs Resolutions from the Project Summary, with a second Signature only where the Developer's own policy asks for one.

What is a Resource in Vextrus?

A Resource is a material (cement, Rebar, sand, stone chips, bricks), a Labour Contract item or a piece of plant that a BOQ Item consumes, with a unit and a Market Price. A Rate Analysis lists the Resources a BOQ Item consumes per unit, and summed over the Building they give the Material Schedule.

What is a Revision in Vextrus?

A Revision is a re-issue of all or part of a Drawing Set by its consultant, such as revision B after A; in Dhaka practice the latest Revision is the instruction. Vextrus lays the new sheet over the old, lights every changed Element in 3D, and marks every module Revision pending until it is resolved.

See the Revision page

What is a Revision Comparison?

A Revision Comparison is the Element-by-Element difference between the Live Model of one Revision and a baseline the MD picks, the previous Revision or an Issued Estimate: new, removed and changed Elements, with their effect on the Priced BOQ split into quantity effect and price effect, in quantities and money.

What is the RFI list?

The RFI list holds the items only the consultant can answer, one Thread per item. A gap in the drawings goes to the consultant through it, and any provisional value meanwhile is labelled inferred until the answer comes, never passed off as read. Every exception is fixed, ruled, sent to the RFI list or recorded before an Estimate is issued.

What is a Rule Set?

A Rule Set is the Measurement Rules a Developer measures by: a copy of the Bangladeshi default set, based on PWD practice, which the Developer edits to match its own habits. Every assumption in it is a visible parameter, and a starting value comes from a published standard, the clause named, where one states it.

What is a Run in Vextrus?

A Run is a length of pipe, conduit, cable or duct between two points of a system. Dhaka MEP drawings draw runs schematically, so a Run is priced by rule per point and per fixture: a named Rule Set parameter the Developer sees and can change. Every Discipline enters the Priced BOQ from its own drawings, never as an allowance.

What is a Running Account bill?

A Running Account bill is a contractor's interim bill for the work done to date, paid as the building rises. In Cost (5D), each claim is checked against the Elements built that support it and certified with a Signature by the MD or the QS, so a claim is paid only up to what the building shows.

S

What is Saleable Area?

Saleable Area is the area the Developer sells: the apartments plus their loaded share of common areas, as the Developer counts it, entered or confirmed by the QS. It is never the Gross Floor Area, which is measured from the confirmed Live Model, and Vextrus labels each area figure as what it is.

What is a Sheet in Vextrus?

A Sheet is one drawing sheet of a Drawing Set, known by its Discipline and its number (a sheet may have no number), with its title, and a revision mark, issue date and source file for each issue. Each issue of a Sheet is a Sheet Revision, and every view on it is accounted for in Coverage.

What is a Sheet Revision?

A Sheet Revision is one issue of one sheet, such as revision B of a structural plan. A Revision reissues some sheets, and the rest keep their current Sheet Revision. The Drawing List shows each Sheet's Sheet Revisions and its supersede chain, so the current issue of every sheet is plain to see.

What is a Signature in Vextrus?

A Signature is a person's signing act in Vextrus, never automatic: issuing an Estimate, signing a BBS, certifying a bill, signing a Resolution or a Pour Release, or a Purchase Order outside the Standing Authority. Each act is enabled only for its assigned signer, and a second Signature applies where the Developer's own policy asks for one.

What is the Site in Vextrus?

The Site is the Project's land outside its Buildings: the boundary wall, external works and site services, where site works belong. A Project holds its Site, one or more Buildings and one Drawing Set, and the Estimate is the total cost of the Project, its Buildings and its Site together. The Site is not the plot itself.

What is the Standing Authority?

The Standing Authority is the MD's limit inside which a Purchase Order goes out without the MD's own Signature. In Materials, Procurement buys each pour's needs at the lowest landed cost inside it; an order outside the Standing Authority waits for the MD to sign, so the MD is asked only about those orders.

What is a Storey Band?

A Storey Band is the range of storeys over which a column, a shear wall or the core keeps one size or specification, as a column schedule gives it. The QS selects, confirms and is asked about a Storey Band as one group; it is never part of an Element's identity. Rebar is shown in ton by Storey Band.

T

What is the Takeoff in Vextrus?

The Takeoff is Vextrus's quantity takeoff: the QS's work of turning a Drawing Set into the confirmed Live Model, one Takeoff Step at a time. The QS confirms the set's conventions, the machine drafts the whole model, and the QS verifies it by exception, with four safeguards in the screen. Nothing the machine proposes counts until the QS confirms it.

See the Takeoff page

What is a Takeoff Step?

A Takeoff Step is one Element Family in the building-first order: sheets, general notes and specification, storeys and levels, grid, foundations and substructure, columns, shear walls and core, beams, slabs, stairs, tanks, walls and openings, rooms and finishes, roof and site works, then each MEP Discipline Part's own steps. Each draws on every sheet that carries its family.

What is the Takeoff Workbench?

The Takeoff Workbench is where a QS takes a Drawing Set to the confirmed Live Model. It puts the drawing first: the sheet in the centre, a rail of Element types in building order with their counts and checks, an Inspector with each Element's basis, Trace and measurement sheet, and the 3D as a linked pane.

What is a Target Cost?

A Target Cost is a figure the MD sets for a Project. The Project Summary warns when the Priced BOQ crosses it, even while the Takeoff is still in progress. A Target Cost is not a Budget: the Budget belongs to cost control and is cut from the Issued Estimate. Guests never see the Target Cost.

What is a Thread in Vextrus?

A Thread is a discussion pinned to an Element or a region of a sheet, so the question sits on the thing it is about. The Developer's team roles discuss it there, and an RFI item is a Thread too. A Thread closes as a Resolution, signed by a named person, which lands as one line in the Journal.

What is the Trace?

The Trace is the link from any figure back to where on which sheet it was read, or to the Question that supplied it. From the MD's number, one click shows how it was measured, a second shows the Element in 3D, and a third lights its own line on the sheet it was read from.

See the Trace page

What is a Trade in Vextrus?

A Trade is a kind of work, such as concrete, formwork, Rebar work, brickwork, plaster or flooring, as PWD's chapters and Labour Contracts divide it. The Priced BOQ can be viewed by Trade as well as by BOQ Section. A Trade is not a Discipline, which is a family of drawings.

V

What is a Variation?

A Variation is a change to the work and its price. When a Revision changes Elements, each change is accepted, rejected where the QS finds the match wrong, or sent to a Variation, which Cost (5D) prices, traced to the Elements that changed. No money carries across a Revision until the QS confirms it.

Who is a Vextrus Engineer?

A Vextrus Engineer is a member of Vextrus's own team who works in a Developer's data by its time-bound invitation, every opening recorded where the MD sees it. Done with you, a Vextrus Engineer sits beside the Developer's QS through its first Takeoff; under the done-for-you service, Vextrus's own QSs run the Takeoff on the same Takeoff Workbench.

W

What is Wastage?

Wastage is the allowance added to a Resource's quantity in a Rate Analysis for cutting, breakage and spillage. It enters the Material Schedule, which says what to buy, and for Rebar the cutting plan; never a BOQ quantity, which is measured net. Wastage is an explicit, visible parameter of the Developer's Rule Set.

Send us a drawing set. See every number traced.

Drawn once. Every number traced.