Vextrus for the site engineer and the site team

What does Vextrus change for the site engineer?

Vextrus gives the Site Engineer and the site team the same Live Model the head office reads. A question sits on the column it is about, each pour waits on its Hold Points until an engineer signs the Pour Release, and what the site builds is recorded on the Elements, beside the design values, never over them.

The top slab of the Building poured in the Live Model, then released.

Today

  • An ERP bought for head office adds reporting between site and head office, and the gap between them stays where it was.
  • Before each pour, its Hold Points have to clear and a Pour Release has to be signed.
  • When drawings are re-issued, the latest Revision is the instruction, and the site has to build to it.
  • Labour contracts are paid per unit of their own scope, per cft of RCC or per sft of plaster, so the work done has to be measured.
  • What the site asks and head office answers stays in chat messages, apart from the drawing it is about.

5.5 hours a week

On average, 5.5 hours a week go on just looking for project data.

Source: PlanGrid & FMI, Construction Disconnected, 2018 · survey average, mostly US

What changes

  1. Collaboration

    • A question goes on the column it is about, as a Thread. Site asks on the column, the Structural Engineer answers there, and the Thread closes as a signed Resolution, one line in the Journal. Site and head office look at the same column, and what was agreed is signed and written down.
  2. Schedule (4D)

    • Each pour shows the Hold Points still open and waits for a signed Pour Release, so the site knows which pour is not ready before the concrete is booked.
    The Building in the Live Model, its pours changing colour one by one in the order they are cast.
  3. Revision

    • When a consultant issues a Revision, Vextrus lays each new sheet over the old and lights the changed Elements in 3D, and every module shows Revision pending until the QS confirms. The site sees on screen which Elements the new drawing changes.
  4. Handover

    • What the site builds is written on the Elements as a dated Record under the name of whoever recorded it. A built value beyond the design’s tolerance shows as a Deviation beside the design value, which stays untouched. Running Account bills are checked against these Records, and at handover every Element carries what was designed, what was built and who recorded it.
    Measured on a synthetic plan: column 4/B, where grid line 4 crosses grid line B, 12 inches by 15 inches as drawn. Its line on the drawing is the column’s face towards grid line A.
    Synthetic section, column 4/B
    4B15"As designed16"As built+1"12"

    Element

    Column 4/B, 3rd floor

    As designed
    12" × 15"From the structural plan, traced to its line on the drawing
    As built
    12" × 16"A Record by the Site Engineer, 12 March 2026, on a tape check of the cast faces
    Deviation
    +1" along grid 4Beyond the tolerance: shown on the same Element, never absorbed
    A synthetic example: one column's Record. The Site Engineer writes what was built beside what was designed, never over it.

Who sees money

The Site Engineer is a team role and sees ৳ module by module. Guests never see money.

Questions

How does the site check that the right bars go into a column?

Against the drawing and the signed BBS. In Vextrus a column’s cage opens in 3D, and each bar opens its callout on the structural drawing. The bars are the ones on the BBS the Structural Engineer signed, and when a Revision changes the column, its BBS shows as Stale before anyone cuts or buys against it. Vextrus reads, checks and flags; it does not design.

How does the site know it is building from the latest drawing?

The Project holds the current sheets, and in Dhaka practice the latest Revision is the instruction. When a Revision arrives, Vextrus lays each new sheet over the old, lights the changed Elements in 3D, and shows Revision pending on every module until the QS confirms the change, so the site sees what changed, Element by Element.

Where does a question from site go in Vextrus?

On the Element it is about. A Thread is pinned to the column, the beam or the region of the sheet in question; site asks there, the Structural Engineer answers, and the Thread closes as a signed Resolution. It lands as a line in the Journal, so the answer stays with the column, not in a chat.

What does the site team record in Vextrus?

The state of each Element and the work done. Each Record writes an As built value on the Element it is about, with who recorded it, when and on what evidence, and never changes the As designed value. A value beyond the design’s tolerance shows as a Deviation beside it, and bills are certified only up to what the Records show is built.