What does Vextrus change for accounts and finance?

In Vextrus, accounts and finance work in Cost (5D), read from the Live Model. The Budget is cut from the Issued Estimate, each Running Account bill checked against the Elements built and certified with a Signature, a Revision the QS sends to a Variation priced from the Elements it changes, and cash and Earned Value from the same model.

One floor’s slab panels in the Live Model: the panels recorded as built, and the panels a Running Account bill claims beyond them.

Today

  • Each Running Account bill’s claim has to be checked against what is built before it is certified.
  • When the consultant re-issues drawings, the latest Revision is the instruction, and its cost has to reach the books as a Variation.
  • Everything is disconnected: bills, the changes behind them and the drawings sit in chat messages and Excel.

27% none; 5% all

27% of respondents say none of their construction apps integrate data; only 5% say all do.

Source: JBKnowledge with Texas A&M University, 2020 ConTech Report (9th Annual Construction Technology Report), 2020 · volunteer survey, 95% North America; self-reported; 2020

What changes

  1. Cost (5D)

    • Each Running Account bill’s claim is checked against the Elements that support it, and only the supported amount is certified: the QS or the MD certifies it with a Signature.
    • The Budget is cut from the Issued Estimate by Storey Band and Construction Stage and names the Issued Estimate it came from; a Budget cell opens to its Measurement Lines.
    • A Revision the QS sends to a Variation is priced from the Elements it changes, and no money moves across a Revision until the QS confirms it.
    • The cash trough, the Project’s lowest cash point, moves with the plan, and Earned Value sets the work done against the work planned.
  2. Trace

    • Any figure is three clicks from its line: its Measurement Lines as a measurement sheet, the Element in 3D, and its line on the drawing.

    The Measurement Sheet

    A synthetic example: the slabs of one floor

    RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)

    The Measurement Sheet: A synthetic example: the slabs of one floor. RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)
    ElementNosLBHQuantity (cft)
    Slab panel S14-5/A-B, 4-5/C-D214'-6"11'-9"0'-5"141.98
    Slab panel S22-3/A-B, 2-3/C-D, 3-4/A-B, 3-4/C-D413'-6"11'-9"0'-5"264.38
    Slab panel S31-2/A-B, 1-2/C-D, 5-6/A-B, 5-6/C-D412'-0"11'-9"0'-5"235.00
    Slab panel S42-3/B-C113'-6"15'-0"0'-5"84.38
    Slab panel S51-2/B-C, 5-6/B-C212'-0"15'-0"0'-5"150.00
    Slab panel S64-5/B-C114'-6"15'-0"0'-5"90.63
    Stair and lift core: no slab (measured with the stair)3-4/B-C0.00
    Total966.37
    Slab panels grid to grid; every beam measured below the slab; the perimeter beams’ outer half, outside the grid line, full depth; the stair and lift core left out.
  3. Collaboration

    • Every Signature is a person’s act, never automatic. A second Signature applies only where the Developer’s own policy sets one, with no default, and every act is written to the Journal, append-only and hash-chained, under the name of whoever did it.
  4. Priced BOQ

    • The Priced BOQ exports to Excel with live formulas and to CSV, so the figures in the month-end file are the ones the QS priced.

Who sees money

Team roles see ৳ in Cost (5D). The QS or the MD signs. Cost (5D) is closed to Guests.

Questions

Does Vextrus replace our accounting software?

No. Vextrus is not an ERP or an accounting system. Your ERP keeps the record of your money. Vextrus keeps the record of your building: the Budget, the bills checked against the Elements built, Variations and cash, read from one Live Model, with the Priced BOQ exported to Excel and CSV.

Who certifies a Running Account bill in Vextrus?

The QS or the MD certifies it with a Signature. Vextrus reads each claim against the Elements that support it, and only the supported amount is certified. A second Signature applies only where the Developer’s own policy sets one; there is no default. What is built is the Site Engineer’s Record on the Elements, not a scan.

How is a drawing change paid for in Vextrus?

When a Revision changes work already let, the QS sends it to a Variation, and Cost (5D) prices it from the Elements it changes; the Revision Comparison splits its cost into quantity effect and price effect. No money moves across the Revision until the QS confirms it, so every Variation traces to the Elements it changed.

What about retention, advance recovery, VAT and AIT?

They stay in your accounts system. Vextrus does not apply retention, advance recovery or VAT and AIT deductions: it gives the certified figure they start from, each Running Account bill’s claim checked against the Elements built and certified with a Signature by the QS or the MD.

Where does a Budget figure come from?

From the Issued Estimate. In Vextrus the Budget is cut from the Issued Estimate by Storey Band and Construction Stage and names the Issued Estimate it came from. A Budget cell opens to its Measurement Lines, each line to its Element in 3D, and each Element to its line on the drawing.