The Developer’s MD
Vextrus gives the Developer’s MD one confirmed Live Model of the building, read from the consultants’ 2D drawings.
Vextrus gives a facility manager the building’s record with the keys. At handover the Live Model goes with the Building: each Element carries what was designed, what was built and any Deviation, with who recorded it and when. After handover, each asset’s warranty, expected life and upkeep are written on the same Element as Records.

US$15.8 billion a year
Owners carry two-thirds of what poor data exchange costs, 85% of it after handover.

Inspector
Lift
After handover, a facility team runs and maintains the building: its assets, their warranties, their upkeep and their service. In Vextrus that facility team works on the same Live Model the building was built from.
Vextrus carries the same database on for the Project’s whole life, the facility services after handover included. The facility team starts on day one with every asset’s identity from the drawing and what was built, found by clicking the asset, not by digging through folders; its warranty and upkeep are added as Records.
Once the building’s own data flows back into it, the Live Model becomes the building’s Digital Twin: every asset with its identity from the drawing, its warranty, its upkeep and its history. Years on, every asset keeps its history, and it still opens the line it was drawn from.
~3x
Over 30 years, running a building costs about three times what building it did.
The Live Model, with the Building. At handover in Vextrus each Element carries what was designed, what was built and any Deviation, with who recorded it and when. The facility team starts with every asset’s identity and history on the same Element, not in a binder.
No. Vextrus carries the same database on for the building’s whole life, the facility services after handover included. Each asset’s warranty, expected life and upkeep are written on its own Element as Records, naming who, when and on what evidence. Once the building’s own data flows back into it, the Live Model becomes the building’s Digital Twin.
As maintained is the Life Phase after handover: an Element’s warranty, expected life and upkeep. It follows As designed, from the drawings, and As built, what was actually cast and spent on site. One Element keeps one identity through all three Life Phases.
Yes. Years on, every asset in the Live Model still opens the line it was drawn from, through its Trace. The facility team goes from an asset to its line on the drawing without searching for the sheet.
Drawn once. Every number traced.