The done-for-you service: our QSs take your Drawing Set to a Priced BOQ

What is the done-for-you quantity takeoff service?

In the done-for-you service, Vextrus’s own QSs take your Drawing Set to the confirmed Live Model and the Priced BOQ, on the same Takeoff Workbench, held to the same safeguards and measured the same way as any QS on Vextrus. A named Vextrus QS signs the Issued Estimate, and your MD or engineer accepts it.

You check it by the measurement sheets, the Traces, the RFI list and the assumptions-and-gaps report. The finished Takeoff is your Building’s confirmed Live Model: one confirmed record of every Element (each column, beam, slab panel, wall and opening), traced to its line on the drawing. Every module after it reads the same model.

Convention card

Synthetic drawing crop

“This layer holds the columns”

The Elements that ride on it: every column on this layer

ConfirmOverrideAsk

Who it is for

For Developers without a QS team of their own. The service stands for any Developer and any Project, not only a first Building. You send the Drawing Set; our QSs take it to the Priced BOQ, a named Vextrus QS signs the Issued Estimate, and your MD or engineer accepts it.

Nothing is installed: Vextrus runs on our servers, and your people open it in the browser. They see every quantity, every measurement sheet and every Trace in your own space on Vextrus.

What you receive

  • The confirmed Live Model of your Building: every Element with its Trace to its line on the drawing.
  • The Priced BOQ, priced at the Market Prices you send us (what to send). Each rate is built from its Rate Analysis, with PWD’s Schedule of Rates rate beside it, as printed and net of PWD’s mark-ups; a gap between them is a question the QS answers, labour included.
  • The Issued Estimate, signed by a named Vextrus QS and frozen with an issue number and date, for your MD or engineer to accept.
  • Rebar, estimated by ratio and labelled so. In this first Priced BOQ each Rebar figure says its Rebar Basis, “by ratio”; the bars are read from the drawing’s callouts in On site, and each figure then says “from the drawing” or “from the drawing + rules”.
  • A measurement sheet behind every quantity, in your space on Vextrus: No. × L × B × H, the quantity in its unit, the deductions named, and each line opening its place on the drawing.
  • Every Trace. Any figure opens the line on the drawing it came from.
  • The RFI list: the items only your consultants can answer, one Thread per item, each with a provisional value labelled inferred until the answer comes.
  • The assumptions-and-gaps report: the notes that name no Element, and every assumption shown as a Rule Set parameter you can see.
  • Your files. The Priced BOQ in Excel with live formulas, in CSV and as a PWD-style print; the Live Model’s views as PNG and PDF. The measurement sheets and Traces open in your space on Vextrus.

One line of a Priced BOQ

Synthetic quantities and prices

BOQ Item
RCC in suspended floor slabs, Mix 1:1.5:3, materials only (Rebar, formwork and labour in BOQ Items of their own): typical floor
Quantity
966.37 cftThe sum of its Measurement Lines: slab panels S1 to S6
Rate
৳334.80 per cftFrom its Rate Analysis, at the Developer's Market Prices
Amount
৳3,23,540.68966.37 × ৳334.80, rounded to the paisa
Benchmark Rate
PWD's Schedule of Rates rate, beside it: a reference, never the rate the Priced BOQ is totalled on.
In your Priced BOQ every line's quantity opens to its Measurement Lines and its rate to its Rate Analysis, in your space on Vextrus. See a Priced BOQ, line by line

Held to the same safeguards

Our QSs are the Takeoff Workbench’s first users, held to the same safeguards and measured the same way as your own QS would be. The machine proposes. The engine measures. The QS confirms. The machine is our own AI models; the engine is code. No quantity comes from a language model.

The four safeguards are in the screen, and no QS can skip them: cross-checks before any proposal, a blind spot-measure of each type, no blind bulk-accept, and a review mode of its own. No Estimate is issued with an unresolved exception.

Our QSs practise on a test Building with planted mistakes, in Vextrus’s own Project and kept apart from yours: nothing from it can enter your Project, your Journal or your output. See how the AI proposes and code measures

Our QSs and Vextrus Engineers

Under the service, Vextrus’s own QSs run your Takeoff, a named Vextrus QS signs your Issued Estimate, and a Vextrus Engineer works in your data by your time-bound invitation.

Every Confirmation is written to the Journal under the QS’s own name. Each Element in the Live Model keeps, beside its basis, who confirmed it and when.

Done for you, done with you, or your QS on Vextrus

  • Done for you.

    Without a QS team, stay on the service: our QSs run the Takeoff, and a named Vextrus QS signs the Issued Estimate. ৳12 per sft of Gross Floor Area + VAT, ৳8 for every sft above 25,000, minimum ৳1.2 lakh + VAT a Building.

  • Done with you.

    With a QS of your own, start here: a Vextrus Engineer sits beside your QS through your first Takeoff.

  • Your QS on Vextrus.

    Your QS runs the Takeoff and issues the Estimate with a Signature. ৳6 per sft + VAT, ৳4 for every sft above 25,000, minimum ৳60,000 + VAT a Building.

Introductory rates, 26 October 2026. Every step uses the same Takeoff Workbench, and either way the output is the same: the confirmed Live Model, the Priced BOQ with its measurement sheets and Traces, and every module that reads them. See every price, On site and After handover included

What happens after you send a drawing set

You send the whole Drawing Set as your consultants issue it, with your Market Prices, and we answer with a fixed quote for your Building, on its Gross Floor Area. We open your own space on Vextrus and invite your people by name, with their roles. Our QSs take the set to the confirmed Live Model and the Priced BOQ, a named Vextrus QS signs the Issued Estimate, and your MD or engineer accepts it.

See every step after you send a drawing set

Questions

Which prices does the Priced BOQ use?

Your own. Each rate is built from its Rate Analysis at the Market Prices you send us: for materials such as cement, Rebar, sand, stone chips and bricks, and for your Labour Contracts, per cft of RCC or per sft of plaster. Where the PWD Schedule of Rates lists the item, its rate stands beside yours as the Benchmark Rate, net of PWD's mark-ups, never the rate the Priced BOQ is totalled on.

What do we receive?

You receive the confirmed Live Model and the Priced BOQ, with a measurement sheet behind every quantity (No. × L × B × H, the quantity in its unit, the deductions named, each line opening its place on the drawing), every Trace, the RFI list and the assumptions-and-gaps report. A named Vextrus QS signs the Issued Estimate. Every Rebar figure says its Rebar Basis: "by ratio" until the bars are read from the drawing's callouts.

Who checks the delivered work?

A named Vextrus QS signs the Issued Estimate, and your MD or engineer accepts it. Our QSs are held to the same safeguards as any QS on Vextrus: cross-checks, a blind spot-measure, no blind bulk-accept and a dedicated review mode, with zero unresolved exceptions before an Estimate is issued. Every figure opens its measurement sheet and its Trace, beside the RFI list and the assumptions-and-gaps report.

Do we need our own QS?

No. The done-for-you service is for Developers without a QS team: our QSs run the Takeoff, a named Vextrus QS signs the Issued Estimate, and your MD or engineer accepts it. With a QS of your own, you can start done with you, a Vextrus Engineer beside your QS through your first Takeoff; then your QS runs it on Vextrus.

Send us a drawing set. See every number traced.

Drawn once. Every number traced.