Vextrus, presented
Drawing-to-Handover
Every quantity, traced to its line.
Vextrus turns a Developer’s 2D drawings into one Live Model, and any number opens the line on the drawing it came from. The Priced BOQ, buying, the site, cost and handover all work from it.

What Drawing-to-Handover means for a Developer
Drawing-to-Handover: one Live Model of the building, read from the Developer’s 2D drawings and confirmed by its QS, that the Priced BOQ, Rebar, buying, the site and cost all work from, every quantity traced to its line, until the record goes with the building at handover.
Vextrus is Drawing-to-Handover software for real-estate Developers: the quantity takeoff and BOQ software that reads your 2D AutoCAD (DWG) drawings is where it starts, and every module after it reads the same Live Model.
Your ERP keeps the record of your money. Vextrus keeps the record of your building.
We don’t ask anyone to stop drawing.
Your consultants keep drawing in 2D; nobody draws the building again.
The problem: one building, a copy for every team
When a building lives as a set of 2D drawings, every team works from its own copy. If your office runs on chat messages and Excel, nearly everything is disconnected.
The QS measures the drawings by hand into Excel to make the BOQ. An ERP records the money against those quantities; it does not trace them to their lines on the drawing. The building’s data stays locked in its 2D CAD drawings, and even in 3D BIM files. For the MD, the figures sit in spreadsheets kept apart from the drawing.
BIM (building information modelling) means building the design as a 3D model, in specialist software, by trained modellers. BIM is not new, and a Developer whose consultants draw in 2D still has to draw the building again.
35% of the week
Construction professionals spend 35% of their week hunting data, settling disputes, fixing mistakes.
Connecting the dots: one chain, from the drawing to the building's whole life
The drawing
The Developer’s 2D Drawing Set, as its consultants issue it. They keep drawing in 2D.
One confirmed Live Model
The set is read once and confirmed by the QS. Every Element keeps its Trace to its line.
Every module reads it
Takeoff, Priced BOQ, Rebar, Revision, Collaboration, Materials, Schedule (4D), Cost (5D), roles and views, handover.
The building’s whole life
At handover the Live Model goes with the building. Once the building’s own data flows back into it, it becomes the building’s Digital Twin.
Every module is connected, and the root data is traceable: a number anywhere in the chain opens the line on the drawing it came from.
One record for a building is an old idea.
Vextrus starts it where the building already exists: in its 2D drawings.
Read how one database for a building began, and where the 2D drawing fits · See every module in the product’s order
Takeoff: quantity takeoff from the 2D Drawing Set to a confirmed Live Model
The Takeoff in Vextrus is the quantity takeoff of a Developer's 2D drawings: the QS's work of turning the Drawing Set into the confirmed Live Model. The machine drafts the model from the set's own conventions, and the QS verifies it by exception on the drawing. Only confirmed Elements count, and each quantity reaches the Priced BOQ with its Trace.
What you do
Upload the whole Drawing Set once and confirm a few one-click convention cards; the machine drafts the whole model. In a dedicated review mode, your QS sees each type's cross-checks first, spot-measures a few items, then verifies the draft on the drawing.
What changes
Your QS no longer re-measures the whole drawing by hand: they look at the doubtful lines and fix one, and the takeoff takes a fraction of the time. No type is accepted until its checks pass.

The AI in Vextrus: the machine proposes, the engine measures, the QS confirms
The AI in Vextrus proposes and never measures. Vextrus's own local models read each Drawing Set's conventions and name objects; code computes every quantity, the same way every time, and a model only chooses among options code has found. Nothing a model proposes counts until the QS confirms it. The machine proposes, the engine measures, the QS confirms.
What you do
Run it again: the same drawings and Confirmations give the same result.
What changes
Every number you are shown has a line on the drawing behind it that anyone can re-measure, and your drawings and data never reach a third-party AI. The Takeoff uses no outside AI. Our own models run on our own servers; code measures every quantity, and every figure not read from the drawing names the rule that made it.
Convention card
Synthetic drawing crop
“This layer holds the columns”
The Elements that ride on it: every column on this layer
ConfirmOverrideAsk
The Live Model: one confirmed model of the building
The Live Model in Vextrus is the building as one dataset of confirmed Elements, read from the Developer's 2D drawings and confirmed by its QS. Each Element keeps a stable identity, its geometry, its Trace to the drawing and its basis. The Priced BOQ, the Material Schedule, the 3D and every later module are readings of it.
What you do
Open the Building and click an Element: the Inspector shows its identity, grid, storey, basis and place in the BOQ, beside its Trace to the drawing. Colour the Building by basis or by progress, or draw a section box over a storey and read what is inside.
What changes
You can draw a box round any part of your building and it tells you what is inside: one model, not five spreadsheets.

The Trace: now the number knows where it came from
The Trace in Vextrus is the link from any figure back to where on which sheet it was read, or to the Question that supplied it. A click on the Live Model goes straight to the drawing, the Element's own line lit. The figures of every module trace to the same root, so any number can be checked.
What you do
Click any figure. One click: how it was measured, its Measurement Lines on the measurement sheet. Two: that Element in 3D. Three: its own line lit on the sheet it was read from.
What changes
Any number you are shown can be checked against the drawing in three clicks: nobody has to take anyone's word. A total opens all its Measurement Lines; each one opens its own line on the sheet.

The Measurement Line
- Element
- Slab panel S1
- Nos
- 1
- L
- 14'-6"
- B
- 11'-9"
- H
- 0'-5"
- Quantity
- 70.99 cft
The figure is this plan’s own arithmetic.
Priced BOQ: every quantity traced, every rate built from its Rate Analysis
The Priced BOQ in Vextrus is the bill of quantities for a building, item by item by trade, with a rate and an amount in ৳ on every BOQ Item. Each quantity is the sum of its Measurement Lines, traced to its line on the drawing; each rate comes from its Rate Analysis at the Developer's Market Prices.
What you do
Click any quantity, rate or amount. A drawer lists its Elements with storey, grid place and sheet; open the BOQ Item's measurement sheet (No. × L × B × H) with its Trace, or show it in 3D. Enter rates, add and remove columns as in Excel, and export.
What changes
Every taka in your Priced BOQ shows how it was built. When a price moves, you change it once and the whole Priced BOQ follows, while every Issued Estimate keeps the prices it was issued on.
One line of a Priced BOQ
Synthetic quantities and prices
- BOQ Item
- RCC in suspended floor slabs, Mix 1:1.5:3, materials only (Rebar, formwork and labour in BOQ Items of their own): typical floor
- Quantity
- 966.37 cftThe sum of its Measurement Lines: slab panels S1 to S6
- Rate
- ৳334.80 per cftFrom its Rate Analysis, at the Developer's Market Prices
- Amount
- ৳3,23,540.68966.37 × ৳334.80, rounded to the paisa
- Benchmark Rate
- PWD's Schedule of Rates rate, beside it: a reference, never the rate the Priced BOQ is totalled on.
Revision: what changed, and what it costs, before it is built
A Revision is a re-issue of all or part of a Drawing Set by its consultant; in Dhaka practice the latest Revision is the instruction. Vextrus lays each new sheet over the old, lights the changed Elements in 3D and splits the cost into quantity effect and price effect. Nothing is priced until the QS confirms.
What you do
Upload the new issue whole and confirm each sheet's pairing with the sheet it supersedes. Read the overlay, changes coloured and measurements matched. Confirm every moved pair, then accept, reject or send each change to a Variation.
What changes
When the drawings change, you see what changed in your building and what it costs before anyone builds it, and nothing is priced until your QS confirms.
Detail: grids 4 to 6, A to B. Slab panel S1’s other bay, on C to D, changes the same way.
- The old issue: dashed, in pencil
- The new issue: drawn over it
- Changed: hatched here (coloured in Vextrus)
- A moved pair: outlined, waiting for the QS
Collaboration: one column, one truth
Collaboration in Vextrus runs on Threads, Resolutions, the Journal and Signatures. A Thread is pinned to the Element or the sheet region it is about, and closes as a Resolution signed by a named person. The append-only, hash-chained Journal keeps every run record, Confirmation and agent act. Every Signature is a person's act, never automatic.
What you do
Pin a Thread on the column it is about. The team discusses it there, on the Element, and when the matter is settled the Thread is resolved into a Resolution and signed by the MD.
What changes
Your site and your head office look at the same column, and what was agreed is signed and written down, so nobody has to ask who said yes.

Build from the same model
Planning, buying, the site and cost all read the Live Model the Estimate was issued from.

- 01
The Budget is cut
Who: the QS and the MD. From the Issued Estimate, by Storey Band and Construction Stage.
- 02
The plan is generated
Who: the Planner. Activities on Elements, pours as the spine, Construction Stages in their order, overlapping where the work allows: the Building rises in 4D by date.
- 03
Materials are bought
Who: Procurement; the MD signs any order outside the Standing Authority, the MD’s own buying limit. Needs, a requisition, an RFQ, the lowest landed cost, then a Purchase Order: inside the Standing Authority it goes out, and outside it the MD signs.
- 04
The team works on the model
Who: the team roles; the MD signs. Threads pinned to Elements and sheet regions close as signed Resolutions, and the Journal records every run record, every Confirmation and every automated step, each under its own actor.
- 05
A Revision arrives
Who: the QS; the Structural Engineer for the BBS. The new sheet lies over the old, the changed Elements light up and their cost splits into quantity effect and price effect. No money carries across until the QS confirms every moved pair, and a signed BBS it touches goes stale.
- 06
The site records what is built
Who: the Site Engineer. Element states are recorded, a pour’s Hold Points clear before its Pour Release is signed, and As built Records land on Elements, a Deviation shown beside its design value.
- 07
Bills are checked against what is built
Who: the QS and the MD. Each bill’s claim is checked against the Elements that support it; a claim is certified only up to what the Building shows, and a person signs it. Variations are priced; cash and Earned Value are read from the model.
- 08
Outsiders watch, never the money
Who: Guests. Buyers follow progress by Construction Stage; the Bank engineer and the Land-owner’s engineer see quantities only. Guests never see money, in any view, drawer, tooltip or export.
Roles and views: one Building, every role its own view
Roles and views in Vextrus give every role its own view of the one Building. The QS and the MD see ৳; team roles see it module by module; Sales sees quantities only in the Priced BOQ. Guests from outside the Developer, invited by name and scoped to Projects, never see money, in any view, drawer, tooltip or export.
What you do
Invite a Bank engineer by name, as a Guest scoped to one Project. They open the Project Summary with quantities only: no Estimate, no Target Cost, no Resolutions and no ৳ anywhere, while the MD's Project Summary of the same Project shows all of them.
What changes
Your bank, your land-owner and your buyers can watch the building without ever seeing what it costs you.

Hand over the record with the keys
Handover
Who: the Developer. The Live Model goes with the Building: each Element carries what was designed, what was built and any Deviation, with who recorded it and when. In the research’s scale, what is handed over is a Level 1 digital model: the record of the building, before its own data feeds it.
Dong & Moshood, Buildings (MDPI), 2026
The Digital Twin
Who: the facility team. As maintained Records land on the same Elements. Once the building’s own data flows back into it, the Live Model becomes the building’s Digital Twin: every asset keeps its identity from the drawing and its history.

How Vextrus compares, class by class
The table compares classes of software, not products: each cell gives the class’s usual job. Vextrus reads the 2D drawing itself.
ERP, BIM authoring, takeoff tools, AI chatbots and Vextrus, compared row by row.
| Compared on | ERP | BIM authoring (3D modelling) | Takeoff tools (classic and AI) | AI chatbots | Vextrus |
|---|---|---|---|---|---|
| It starts from | Mostly entries typed or imported; some say they read CAD drawings | A 3D model a person builds over the 2D drawing | Mostly PDF sheets; some take CAD files | An uploaded picture or PDF of the sheet | The whole Drawing Set as the consultants issue it, read from its DWG drawings |
| The quantities come from | Usually someone else’s measurement, typed or imported | The model’s elements, as the modeller drew them | Usually a person’s markups, or an AI draft a person checks | Usually a language model’s answer | Code measures the drawing; the QS confirms |
| Each figure traces to | Its entry in the system; none we read traces a figure to its line | The model’s element, usually not the 2D line | Mostly a markup or a model; a few link a quantity to a drawing entity, for the estimate | Some cite the page they read | Its line on the drawing, three clicks away |
| A Priced BOQ | Usually held and spent against, not measured | Quantity schedules; pricing mostly in another tool | Some suites price it; many end at an Excel estimate | No, not from a drawing | Yes, in ৳, by BOQ Section and Trade, the PWD Benchmark Rate beside each item the Schedule lists |
| Site, cost and materials | Usually from the BOQ it holds | Often through add-ons, from the 3D model | Mostly not: most end at the estimate; a few suites carry on for the contractor | No, not from a drawing | Rebar, Materials, Schedule (4D) and Cost (5D) read the same Live Model |
| At handover | Records of units and money | The model, where someone keeps it current | Mostly not covered | No, not from a drawing | The Live Model goes with the Building: what was designed, what was built, and who recorded it |
See how the Trace works · See why no quantity comes from a language model
Two ways in, one output
- 01
Your QS on Vextrus
৳6 per sft + VAT
৳4 per sft + VAT for every sft above 25,000; minimum ৳60,000 + VAT a Building.
For Developers with a QS of their own, on any Project.
- 02
Done for you
৳12 per sft + VAT
৳8 per sft + VAT for every sft above 25,000; minimum ৳1.2 lakh + VAT a Building.
For Developers without a QS team of their own, on any Project.
Either way you get the same confirmed Live Model and the same Priced BOQ, with a measurement sheet and a Trace behind every quantity, and every module after it reads the same model.
Introductory rates, 26 October 2026. Every price is in taka, per sft of your Building’s Gross Floor Area, + VAT.
What you pay for, and when
- 01
The Takeoff, once per Building
Done for you ৳12 per sft + VAT
Your QS on Vextrus ৳6 per sft + VAT
Done for you, or Your QS on Vextrus. It makes the confirmed Live Model and the Priced BOQ, and it is the way in.
- 02
On site, while the Building is built
৳2 per sft a year + VAT
Rebar, Schedule (4D), Materials, Cost (5D) and Collaboration, every one reading the same Live Model. Charged by the month, invoiced every quarter.
- 03
After handover
৳0.5 per sft a year + VAT, from the second year
The Live Model goes with the keys. The first year is included with On site; from the second year it is paid by whoever runs the building, if they keep it on. Once the building’s own data flows back, the Live Model becomes its Digital Twin.
What happens after you send a drawing set
- 01
You send the whole Drawing Set as your consultants issue it, with your Market Prices.
- 02
We answer with a fixed quote for your Building, by its Gross Floor Area, at our published rates.
- 03
We open your own space on Vextrus and invite your people by name, with their roles.
- 04
Our QSs take the set to a Priced BOQ
They account for every sheet, confirm the set’s conventions, review the drafted model by exception, rule once per issue type, send the items only your consultants can answer to the RFI list, and price the Priced BOQ at your Market Prices.
- 05
You receive the Priced BOQ with its measurement sheets and Traces in your space on Vextrus, the RFI list and the assumptions-and-gaps report. In this first Priced BOQ, Rebar is estimated by ratio and labelled so; the bars are read from the drawing’s callouts in On site.
- 06
A named Vextrus QS signs the Issued Estimate, and your MD or engineer accepts it. Your MD takes it to the board.
- 07
Every later module reads the same Live Model, on site and after handover.
If your own QS runs the Takeoff on Vextrus, the steps are the same: your QS takes step 4 and issues the Estimate with a Signature. With a QS of your own you can start done with you, a Vextrus Engineer beside your QS through your first Takeoff.
Start with your own drawings
Send us a drawing set. See every number traced.
Drawn once. Every number traced.