Takeoff: quantity takeoff from the 2D Drawing Set to a confirmed Live Model

What is the Takeoff in Vextrus?

The Takeoff in Vextrus is the quantity takeoff of a Developer's 2D drawings: the QS's work of turning the Drawing Set into the confirmed Live Model. The machine drafts the model from the set's own conventions, and the QS verifies it by exception on the drawing. Only confirmed Elements count, and each quantity reaches the Priced BOQ with its Trace.

Vextrus is Drawing-to-Handover software for real-estate Developers: the quantity takeoff and BOQ software that reads your 2D AutoCAD (DWG) drawings is where it starts, and every module after it reads the same Live Model.

One beam in the Live Model, first a Proposal, then confirmed by the QS.

What you do

Upload the whole Drawing Set once and confirm a few one-click convention cards; the machine drafts the whole model. In a dedicated review mode, your QS sees each type’s cross-checks first, spot-measures a few items, then verifies the draft on the drawing.

What changes

Your QS no longer re-measures the whole drawing by hand: they look at the doubtful lines and fix one, and the takeoff takes a fraction of the time.

No type is accepted until its checks pass.

How the Takeoff works, step by step

The whole set, sorted by DisciplineEvery view on every sheet accounted for

  • Structural
  • Architectural
  • MEP
  • Fire

Convention card: the column layer

“this layer holds the columns”

The drafted model

24 columns, 38 beams, 14 slab panels: Proposals, counting toward nothing until the QS confirms them

Beams: the cross-checks, then a blind spot-measure

  • Typical-floor repetition
  • Spot-measure, 3 beams
  • Schedule against the plan: 1 exception

Exception: grid B, 2-3, its depth on the plan differs from the beam schedule

The fix, offered to 1 similar beam: grid C, 2-3, the same span and the same wall on it, and to both on every typical floor

Unclaimed geometry: one issue group

9 pieces on the slab layer that no drafted Element claims: the sunshades over the windows in the long faces

One ruling per issue type

“Sunshades, traced by hand” releases all 9: each counted, its basis inferred, no check applies

The RFI list: one Thread

The sunshades’ projection is not dimensioned: 1'-6" stands, labelled inferred, until the consultant answers

Unresolved exceptions

0of 3: one fixed, one ruled, one sent to the RFI list

Measured on a synthetic plan: slab panel S1 at grids 4 to 5 and A to B, grid to grid, 14 feet 6 inches by 11 feet 9 inches, 5 inches thick. Its line on the drawing is the panel’s edge on grid line A, between grids 4 and 5.
Synthetic plan
123456ABCDS3S5S3S2S4S2S2S2S1S6S1S3S5S3exceptionofferedunclaimedtraced by handinferred · RFIpassed
  1. Upload the whole set once.

    The QS uploads the whole Drawing Set as the consultants issue it; Vextrus stores each file, sorts the set by Discipline and reads Structural first, then Architectural with it, then MEP and fire. The QS sees each file’s Discipline and fixes a sort.

    Whole-set upload: the set goes in once

    The QS uploads the whole Drawing Set once, as the consultants issue it: their 2D DWG drawings, read with Vextrus’s own decoder. Vextrus stores each file, sorts the set by Discipline and reads Structural first, then Architectural with it, then MEP and fire. The QS sees each file’s Discipline and fixes a sort where it is wrong.

    Every Discipline from its own drawings

    Each Discipline’s drawings (structural, architectural, electrical, plumbing, fire and the rest) are read into their own Discipline Part, sharing the building’s storeys and grid. Every Discipline goes into the Priced BOQ from its own drawings, never as an allowance. Structure and architecture are measured. Electrical work is priced by the Point, as PWD prices it. Plumbing and fire fixtures and equipment are counted. Runs, which Dhaka MEP drawings draw schematically, are priced by rule per point and per fixture, and the rule is named. A Discipline with no drawings is a Question, never zero.

  2. Every sheet accounted for.

    Coverage assigns every view on every sheet to the Takeoff Steps that read it, marks it used, or excludes it with a reason; the Drawing List is checked both ways against the consultant’s list. A missing Discipline is a Question, never zero.

    Coverage: every sheet accounted for

    Coverage is the account of every view on every sheet of the Drawing Set: assigned to the Takeoff Steps that read it, used by them, or excluded with a reason. Nothing is silently unread. The Drawing List is checked both ways against the consultant’s list, and a Discipline with no drawings is a Question, never zero.

  3. Confirm a few one-click convention cards.

    Each card is one of the set’s own drafting conventions, shown with its drawing crop, its meaning and the Elements and ৳ that ride on it. The QS confirms it, overrides it, or asks.

    Convention cards: every set read on its own conventions

    A convention card is one of the set’s own drafting conventions, found in its own drawings and shown with its drawing crop, its meaning (“this layer holds the columns”) and the Elements and ৳ that ride on it. The QS confirms it in one click, overrides it, or asks, and the item goes to the RFI list. An Override changes only the item it corrects, with the engine’s finding and the QS’s correction side by side. Vextrus stores no office profile: every Drawing Set is read on its own conventions.

    Convention card

    Synthetic plan

    Its meaning

    “this layer holds the columns”

    Rides on it

    The 24 columns of this plan

    The convention card: its meaning, what rides on it and the QS’s three answers; its drawing crop is the column layer lit on the plan.
  4. The machine drafts the whole model.

    Every Element Family in building order, each Element with its Trace, its pieces per storey and its Measurement Lines. The draft counts toward nothing until it is confirmed.

    The drafted model

    From the confirmed conventions, the machine drafts the whole model: every Element Family in building order, each Element with its Trace, its pieces per storey with a solid, and its Measurement Lines. Slabs are drafted from the outline found and shown ghosted until the QS confirms them, and a check flags any slab larger than the building’s footprint. The draft counts toward nothing until it is confirmed.

    The plan on the drawing rises, storey by storey, into the drafted Live Model of the Building.
    Why a person confirms every Element

    Code computes every quantity, and a model may only choose among candidates code found. Vextrus’s own models read the set’s conventions and name objects; confidence comes from external cross-checks, calibrated per Element class, never from a model’s own score. The set’s conventions are always confirmed by the QS, and a Proposal counts toward nothing until the QS confirms it. See how the AI in Vextrus works

    12 of 15

    Against a contractor's takeoff, an AI tool under-measured 12 of 15 areas.

    Source: Sadeh, Geloso & Todorov, ASC Annual Conference, 2026 · one commercial building, 29 items
  5. Review by exception, type by type.

    In building order, from the grid and storeys through the structure to the slabs, then stairs and tanks, walls and openings, rooms and finishes, the roof and site works, then each MEP Discipline: the cross-checks, then a blind spot-measure, then the exception groups, largest quantity first. The four safeguards hold every type.

    Review by exception, in building order

    The QS reviews the draft type by type, in building order: the grid and storeys, piles, caps, tie beams, columns and shear walls, beams and slabs; then stairs and tanks, walls and openings, rooms and finishes, the roof and site works; then each MEP Discipline’s own steps. For each type come the cross-checks, then a blind spot-measure, then the exception groups, largest quantity first; then the QS accepts the type.

    Masonry and finishes are reviewed the same way as the structure: walls and their openings, and rooms and their finishes, each get their type’s cross-checks, a blind spot-measure and their exception groups. Every measurement sheet names its deductions under the Rule Set, such as openings over 0.1 m² (about 1.08 sft, IS 1200) from brickwork.

    Every Element shows one of three check colours (passed, exception, no check applies) and stays marked unseen until the QS has looked at it. The same drawings and the same Confirmations give the same result.

    The Takeoff Workbench: the drawing first

    For the QS, the Takeoff Workbench puts the sheet in the centre. A left rail lists the Element Families in building order, with their counts, checks and open groups; a right Inspector shows each Element’s basis, confirmation, Trace and measurement sheet; the 3D is a linked pane, open by default, in material colours with edges. One click colours it by check status, basis or confirmation, and the Model tab opens it full screen with storeys, section and X-ray. Ribbon tabs (Takeoff, Review, Measure, Model, BOQ) and single review keys act on the focused item; accepting a whole type is always a button that names its count, never a key.

    The Developer Rule Set

    The Rule Set is the Measurement Rules a Developer measures by: a copy of the Bangladeshi default set, based on PWD practice, edited to the Developer’s own habits. One rule, as a QS reads it: deduct openings over 0.1 m² (about 1.08 sft, IS 1200) from brickwork. Every assumption is an explicit, visible parameter: laps, the slab-beam overlap, rounding, deductions, and Wastage, which sits in the Material Schedule and in Rebar cutting, never in a BOQ quantity. A starting value comes from a published standard, the clause named (IS 1200, BNBC 2020), where one states it; where none does, the QS answers one Question per Building. A changed value keeps the standard’s value and clause beside it.

  6. One fix, offered to all similar.

    Fix one Element and Vextrus draws every similar Element on the sheet and across storeys, with the matching rule and the count; one act applies the fix, revertible, never silently.

    One fix, offered to all similar

    Fix one Element and Vextrus draws every similar Element, on the sheet and across storeys, with the matching rule and the count. The QS steps through them, narrows the scope, or marks them not uniform to split the group. One act applies the fix; it can be reverted, and nothing changes silently.

    Fixing one beam offers the same fix to every similar beam, storey by storey.
  7. Unclaimed geometry examined.

    Geometry on a type’s layers that no drafted Element claims is drawn as one issue group; each piece is traced or dismissed with a reason before the type can be accepted.

    Unclaimed geometry: what the machine missed is shown

    Geometry on a type’s layers that no drafted Element claims is drawn in its own colour as one issue group. Each piece is traced or dismissed with a reason, and the type cannot be accepted until it is examined. The count of exceptions falls only when each one is replaced by a read fact, never by hiding one.

  8. One ruling per issue type.

    Exceptions are grouped by issue type, and one ruling settles a whole group with the Elements it releases.

    One ruling per issue type

    Exceptions are grouped by issue type within each type of Element, and one ruling settles a whole group, with the Elements it releases. The QS rules once per issue type, not once per Element.

    Tracing by hand

    The QS can trace any Element by hand on any sheet: a column, wall, beam, slab, opening, pile, cap, tie beam or Point. A hand-traced Element is real and counted; its basis is inferred and its rule is “traced by hand”, never read.

  9. The RFI list and the assumptions-and-gaps report.

    Items only the consultant can answer go to the RFI list, one Thread per item, with a provisional value labelled inferred until the answer comes; notes that name no Element go to the assumptions-and-gaps report.

    The RFI list and the assumptions-and-gaps report

    Items only the consultant can answer go to the RFI list, one Thread per item. The gap goes to the consultant, with a provisional value labelled inferred until the answer comes; it is never passed off as read. Notes that name no Element go to the assumptions-and-gaps report, delivered with the Estimate. Before an Estimate is issued, every exception is fixed, ruled, sent to the RFI list or recorded in the report: zero unresolved exceptions.

  10. Zero unresolved exceptions.

    Every exception is fixed, ruled, sent to the RFI list or recorded in the report before an Estimate is issued.

  11. The confirmed Live Model.

    Solids for confirmed Elements only, each with its basis and, beside it, who confirmed it and when; every act a Confirmation in the Journal. Every later module reads this model.

    What the Takeoff writes, and who sees it

    The Takeoff writes the Live Model’s confirmed Elements, their Measurement Lines and their Traces, and every act is a Confirmation record in the Journal. The QS works in it; the MD reads it and sees the ৳ at risk; it is closed to Guests. Every later module reads the same confirmed Live Model: Rebar, the Priced BOQ, Schedule (4D), Materials and Cost (5D).

Two ways in

Your own QS runs the Takeoff on the Takeoff Workbench. Or you send us the drawing set, and Vextrus’s own QSs run it on the same Workbench, held to the same safeguards and measured the same way. The done-for-you service is for Developers without a QS team: we deliver the Priced BOQ, a measurement sheet behind every quantity, every Trace, the RFI list and the assumptions-and-gaps report; a named Vextrus QS signs the Issued Estimate, and your MD or engineer accepts it. With a QS of your own, your first Takeoff can be done with you, a Vextrus Engineer beside your QS. See the done-for-you service

The four safeguards, all required

People follow wrong machine suggestions, experts included, and training does not stop it. So the safeguards are in the screen, and all four are required.

  1. Cross-checks before Proposals. The schedule against the plan, typical-floor repetition, kg of Rebar per unit volume of concrete, and area ratios.
  2. An active spot-measure. The QS measures 2-3 random items of each type by hand, blind. A difference beyond the type’s tolerance holds the type and draws 2-3 more; a second miss opens the whole type to one-by-one review.
  3. No blind bulk-accept. “Accept beams” is enabled only when the checks pass, the Trace was opened, the spot-measure matched, every exception group is settled and the unclaimed geometry examined; the button names its count and quantities.
  4. A dedicated review mode, separate from pricing and Revisions.

82% → 46%

With a wrong AI suggestion, very experienced radiologists fell from 82% to 46%.

Source: Dratsch et al., Radiology, 2023 · radiology, not construction; simulated AI

The measurement sheet behind every quantity

Every quantity has a measurement sheet behind it, in the form a QS already signs: No. × L × B × H, the quantity in its unit, the deductions named, one row per Measurement Line, and each line opening its place on the drawing. It is in the BOQ’s own units, feet and inches for L, B and H and the item’s unit for the quantity, with metric one switch away. A Measurement Line can be added, deducted or edited with a reason, and an edit changes its basis.

The Measurement Sheet

A synthetic example: the slabs of the plan

RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)

The Measurement Sheet: A synthetic example: the slabs of the plan. RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)
ElementNosLBHQuantity (cft)
Slab panel S14-5/A-B, 4-5/C-D214'-6"11'-9"0'-5"141.98
Slab panel S22-3/A-B, 2-3/C-D, 3-4/A-B, 3-4/C-D413'-6"11'-9"0'-5"264.38
Slab panel S31-2/A-B, 1-2/C-D, 5-6/A-B, 5-6/C-D412'-0"11'-9"0'-5"235.00
Slab panel S42-3/B-C113'-6"15'-0"0'-5"84.38
Slab panel S51-2/B-C, 5-6/B-C212'-0"15'-0"0'-5"150.00
Slab panel S64-5/B-C114'-6"15'-0"0'-5"90.63
Stair and lift core: no slab (measured with the stair)3-4/B-C0.00
Total966.37
Slab panels grid to grid; every beam measured below the slab; the perimeter beams’ outer half, outside the grid line, full depth; the stair and lift core left out.

Questions

What does the Takeoff measure in Vextrus?

The Takeoff in Vextrus measures the building's items from its 2D drawings: the concrete, the brickwork, the plaster, the doors and windows, the finishes and the rest, each in its unit, ready to be priced. Each quantity is the sum of its Measurement Lines in the confirmed Live Model, and each line keeps its Trace to the drawing it was measured from.

What is quantity takeoff in estimating?

In estimating, the quantity takeoff gives every BOQ Item its quantity; the rate turns that quantity into an amount, and the amounts add up to the Estimate. In Vextrus each quantity is the sum of its Measurement Lines in the confirmed Live Model, and each rate comes from a Rate Analysis at the Developer's Market Prices, so every amount opens the line it was measured from.

What is the objective of a quantity takeoff?

The objective of a quantity takeoff is a quantity for every item that can be priced, bought against and checked. Vextrus keeps the check: every quantity has a measurement sheet behind it, No. × L × B × H with the deductions named, and each line opens its place on the drawing. Every later module, from Rebar to Cost (5D), reads the same confirmed Live Model.

How is a takeoff done from 2D DWG drawings?

In Vextrus, the QS uploads the whole Drawing Set of 2D AutoCAD (DWG) drawings once, as the consultants issue it, and Vextrus reads it with its own decoder. The QS confirms a few one-click convention cards, the machine drafts every Element with its Measurement Lines, and the QS verifies the draft by exception on the drawing. Nobody redraws the building in 3D first.

Is the Takeoff in Vextrus automatic?

No. The machine drafts the whole model, and the QS confirms it, by exception, on the drawing. A Proposal counts toward nothing until the QS confirms it, and the set's conventions are always confirmed by the QS. Code computes every quantity; Vextrus's own models only read the set's conventions and name objects.

How does the Takeoff handle MEP drawings?

Vextrus takes every Discipline into the Priced BOQ from its own drawings, never as an allowance. Electrical work is priced by the Point, as PWD prices it; plumbing and fire fixtures and equipment are counted; runs, which Dhaka MEP drawings draw schematically, are priced by rule per point and per fixture, with the rule named. A Discipline with no drawings is a Question, never zero.