Vextrus films
Moments from the Vextrus films, in the order the films tell them, each with the words that go with it. Every clip is silent and shows the Demo building.

The drawing becomes the Live Model
“Then the machine drafts the model. Storey by storey, the lines become a Live Model, ready for the QS to confirm.”
We don’t ask anyone to stop drawing.
Your consultants keep drawing in 2D; nobody draws the building again.
Same drawing, same answer
Run it again: the same drawings and the same Confirmations give the same result, because code computes every quantity.
| Run | Drawings and Confirmations | Slab panel S1 |
|---|---|---|
| First run | The same | 70.99 cft |
| Run again | The same | 70.99 cft |
Draw a box round any floor
“Draw a box round any floor: what is inside, and what it costs.”

The QS checks the exceptions
“The QS checks the exceptions, and spot-measures each type.” A Proposal counts toward nothing until the QS confirms it.

Fix one beam, and every similar beam is offered the same fix
“Fix one beam, and every similar beam is offered the same fix.” The QS rules once for each kind of issue, not once for each Element.

Three clicks to the line
“The MD asks again. One click: how it was measured. Two: that wall, in 3D. Three: the line on the drawing.”

One model, and every part of the work reads from it
“One model, and every part of the work reads from it.” The Priced BOQ, Rebar, the schedule, buying, cost and handover are readings of the same Live Model.

One column, one truth
“Collaboration. Site asks on the column; the structural engineer answers; the MD signs. One column, one truth.”

Signed before a bar is cut
“Rebar. The bar schedule, read from the drawing, checked against the building code. Signed before a bar is cut. Stale if changed.”

The cheapest quote isn’t the cheapest delivered
“Materials. Vextrus ranks quotes by landed cost and orders inside the MD’s limits. The cheapest quote isn’t the cheapest delivered.”

Pay for what’s built
“Cost. A bill claims the formwork complete; the model shows sixty-one percent built. Pay for what’s built. Nothing more.”

The building rises, pour by pour
“Schedule. Drag the date: the building rises, pour by pour. On pour day, every Hold Point clears, and an engineer signs the Release.”

Buyers watch their building rise, never a taka
“Roles. The bank sees quantities; buyers watch their building rise, never a taka. Guests never see costs.”

The record goes with the keys
“At handover: what was designed, what was built, and who recorded it. The record goes with the keys.”

The record goes with the building
“When the building’s own data flows back, the Live Model becomes its Digital Twin. Years on, every asset keeps its history. And it still opens the line it was drawn from.”

Send us a drawing set. See every number traced.
Drawn once. Every number traced.