Priced BOQ: every quantity traced, every rate built from its Rate Analysis
What is the Priced BOQ in Vextrus?
The Priced BOQ in Vextrus is the bill of quantities for a building, item by item by trade, with a rate and an amount in ৳ on every BOQ Item. Each quantity is the sum of its Measurement Lines, traced to its line on the drawing; each rate comes from its Rate Analysis at the Developer's Market Prices.
One BOQ Item of the Priced BOQ
Synthetic quantities and prices
- BOQ Section
- Super-structure
- BOQ Item
- Reinforced cement concrete in suspended floor slabs, Mix 1:1.5:3, materials only (Rebar, formwork and labour in BOQ Items of their own): typical floor
- Unit
- cft
- Quantity
- 966.37
- Rate
- ৳334.80From its Rate Analysis
- Amount
- ৳3,23,540.68966.37 × ৳334.80, rounded to the paisa
Its quantity opens to its Measurement Lines, its rate to its Rate Analysis: both below, under What you do.
What you do
Click any quantity, rate or amount. A drawer lists its Elements with storey, grid place and sheet; open the BOQ Item’s measurement sheet (No. × L × B × H) with its Trace, or show it in 3D. Enter rates, add and remove columns as in Excel, and export.
Its quantity: the sum of its Measurement Lines
The Measurement Sheet
A synthetic example: the slabs of the plan
RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)
| Element | Nos | L | B | H | Quantity (cft) |
|---|---|---|---|---|---|
| Slab panel S14-5/A-B, 4-5/C-D | 2 | 14'-6" | 11'-9" | 0'-5" | 141.98 |
| Slab panel S22-3/A-B, 2-3/C-D, 3-4/A-B, 3-4/C-D | 4 | 13'-6" | 11'-9" | 0'-5" | 264.38 |
| Slab panel S31-2/A-B, 1-2/C-D, 5-6/A-B, 5-6/C-D | 4 | 12'-0" | 11'-9" | 0'-5" | 235.00 |
| Slab panel S42-3/B-C | 1 | 13'-6" | 15'-0" | 0'-5" | 84.38 |
| Slab panel S51-2/B-C, 5-6/B-C | 2 | 12'-0" | 15'-0" | 0'-5" | 150.00 |
| Slab panel S64-5/B-C | 1 | 14'-6" | 15'-0" | 0'-5" | 90.63 |
| Stair and lift core: no slab (measured with the stair)3-4/B-C | 0.00 | ||||
| Total | 966.37 | ||||
Its rate: from its Rate Analysis
Its rate: the Rate Analysis
Synthetic prices
RCC in suspended floor slabs, Mix 1:1.5:3, materials only per cft
| Resource | Per cft, with Wastage | Market Price | ৳ |
|---|---|---|---|
| Cement৳540 a 50 kg bag | 0.228 bagWastage 2 % | ৳540 a 50 kg bag | ৳123.12 |
| Coarse sand৳60 a cft | 0.441 cftWastage 5 % | ৳60 a cft | ৳26.46 |
| Stone chips৳210 a cft | 0.882 cftWastage 5 % | ৳210 a cft | ৳185.22 |
| Working rate, per cft | ৳334.80 | ||
- Mix 1:1.5:3 with its dry-volume factor 1.54; a bag of cement 1.25 cft. Wastage is added to each Resource’s quantity here, never to the BOQ quantity.
- Labour, Rebar and formwork are BOQ Items of their own: a Labour Contract per cft of RCC, so this rate is materials only and its description says so.
- In Vextrus the Benchmark Rate stands beside this working rate: the PWD Schedule of Rates rate, a reference, never the rate the Priced BOQ is totalled on.
What changes
Every taka in your Priced BOQ shows how it was built. When a price moves, you change it once and the whole Priced BOQ follows, while every Issued Estimate keeps the prices it was issued on.
One Market Price, changed once
Synthetic prices
Market Price Cement
was ৳540, now ৳560 a 50 kg bag
RCC in suspended floor slabsMix 1:1.5:3, materials only
Its Rate Analysis Cement, 0.228 bag per cft
Working rate, per cft
was ৳334.80, now ৳339.360.228 × ৳20 = +৳4.56
Brickwork in walls1:4 mortar, materials only
Its Rate Analysis Cement, 0.060 bag per cft
Working rate, per cft
was ৳182.63, now ৳183.830.060 × ৳20 = +৳1.20
Plaster to walls1:4, 0.5" thick, materials only
Its Rate Analysis Cement, 0.011 bag per sft
Working rate, per sft
was ৳7.62, now ৳7.840.011 × ৳20 = +৳0.22
Rebar workRebar and binding wire
Its Rate Analysis No cement
Working rate, per kg
As it was
This page’s BOQ Item, the floor’s slabs
was ৳3,23,540.68 , now ৳3,27,947.32 966.37 × ৳339.36
Issued Estimate
Keeps the prices it was issued on: Cement at ৳540 a 50 kg bag
How it works
- 01
The confirmed Live Model's Measurement Lines give each BOQ Item its quantity, in seven BOQ Sections: Sub-structure, Super-structure, Masonry, Finishes, Doors & Windows, Services and External works.
- 02
Each quantity is rounded in its unit, as the Rule Set sets it; the amount is that printed quantity times the rate, exactly.
- 03
Each rate comes from its Rate Analysis: the Resources the BOQ Item consumes per unit, priced at the Developer's Market Prices. The Benchmark Rate stands beside it.
- 04
Open any quantity, rate or amount to its Elements, its measurement sheet and its line on the drawing.
- 05
When a price moves, change its Market Price once: every working rate and amount that uses it follows.
- 06
The Estimate adds preliminaries and site overheads, contingency and taxes to the direct cost, each layer shown and editable.
- 07
Issue the Estimate with zero unresolved exceptions, by a Signature and never automatically: the Priced BOQ, the Material Schedule, the Market Prices, the Rule Set version and the Live Model's state freeze as an Issued Estimate with an issue number and date.
- 08
Export to Excel with live formulas, to CSV, or as a PWD-style print.
The Priced BOQ in detail
The seven BOQ Sections
BOQ Items sit in seven BOQ Sections, in this order: Sub-structure, Super-structure, Masonry, Finishes, Doors & Windows, Services and External works. The same Priced BOQ can be viewed by Trade: concrete, formwork, Rebar work, brickwork, plaster, flooring and the rest.
Where each quantity comes from
Each quantity is the sum of its Measurement Lines: a measurement sheet in Vextrus behind every measured BOQ Item (No. × L × B × H, the quantity in its unit, the deductions named), each line opening its place on the drawing. Each quantity is rounded in its unit, as the Rule Set sets it, and the amount is that printed quantity times the rate, exactly. Quantity cells are live-linked to the Takeoff, not typed in.
Where each rate comes from
A Rate Analysis breaks a BOQ Item into the Resources it consumes per unit. A Market Price is the one place a price changes: change it once and every working rate and amount that uses it follows, while each Issued Estimate keeps the prices it was issued on. Wastage enters the Material Schedule, never a BOQ quantity.
A Labour Contract, priced per cft of RCC, per sft of plaster or per sft of casting area (Rebar binding, shuttering and casting together), is its own BOQ Item. Each item it covers takes no other labour, and its description says so, so a concrete rate that covers materials only reads as exactly that.
The Benchmark Rate
Beside each working rate stands the Benchmark Rate: the PWD Schedule of Rates rate, as printed and net of PWD’s mark-ups (profit, overhead and VAT); a gap between them is a question the QS answers, labour included. It is a reference. The Priced BOQ is never totalled on it.
Lump Sum and Provisional Sum
A Lump Sum is one typed amount with no Rate Analysis, such as a utility connection charge. A Provisional Sum is an amount set aside for work whose scope is still open, shown at the end of the BOQ Section it provides for. Both stay outside the measured subtotal.
The Estimate and the Issued Estimate
The Estimate is the total cost of a Project: the Priced BOQ’s direct cost plus preliminaries and site overheads, contingency and taxes, each layer shown and editable. Issuing it takes a Signature, never an automatic step, and freezes the Priced BOQ, the Material Schedule, the Market Prices, the Rule Set version and the Live Model’s state into an Issued Estimate with an issue number and date: the figure the MD takes to the board, which later changes are compared against.
Who sees ৳
The QS and the MD work the Priced BOQ in full. Sales sees quantities only, with no rate entry and no export, and so does a Guest.
Questions
How is a BOQ calculated?
In the Priced BOQ, each measured BOQ Item's quantity is the sum of its Measurement Lines (No. × L × B × H), rounded in its unit as the Rule Set sets it. Its rate comes from its Rate Analysis at the Developer's Market Prices. The amount is the printed quantity times the rate, exactly, so every BOQ Item in Vextrus cross-checks by hand.
How does the Priced BOQ use each Rate Analysis?
In the Priced BOQ, each measured BOQ Item's working rate comes from its Rate Analysis: the Resources the item consumes per unit (cement, sand, stone chips, bricks, Rebar, a Labour Contract item or plant), priced at the Developer's Market Prices. A concrete or mortar item's materials follow from its Mix. Change a Market Price once and every rate that uses it follows.
Is the PWD rate the rate Vextrus prices at?
No. Vextrus prices every measured BOQ Item at the Developer's own Market Prices, through its Rate Analysis. The PWD Schedule of Rates rate stands beside it as the Benchmark Rate, as printed and net of PWD's mark-ups (profit, overhead and VAT); a gap between them is a question the QS answers, labour included. It is never the rate the Priced BOQ is totalled on.
Can the Priced BOQ be exported to Excel?
Yes. Vextrus exports the Priced BOQ to Excel with live formulas: change a quantity or a rate in the workbook and the workbook's Estimate follows, while the Live Model and its Traces stay in Vextrus. The Priced BOQ also exports to CSV and as a PWD-style print. Its columns are added and removed as in Excel, so no Developer is locked into one format.
What does the issued BOQ document hold?
Issuing the Estimate, by a Signature, freezes the Priced BOQ, the Material Schedule, the Market Prices, the Rule Set version and the Live Model's state as an Issued Estimate, with an issue number and date. The Priced BOQ goes out to Excel, to CSV or as a PWD-style print. The measurement sheet behind every quantity is in Vextrus, where each line opens its place on the drawing.
Why is Wastage not in the BOQ quantity?
The Priced BOQ is measured net. In Vextrus, Wastage, the allowance for cutting, breakage and spillage, is added to a Resource's quantity in the Rate Analysis and enters the Material Schedule, what to buy, never a BOQ quantity. The quantity checked by hand stays the quantity measured to the drawing.
Send us a drawing set. See every number traced.