Project Summary: the MD's page for one Project
What is the Project Summary in Vextrus?
The Project Summary is the MD's page for one Project in Vextrus: money, programme, risk and the Resolutions waiting. The page holds the total cost and the cost per sft, cost by trade and by floor, what is confirmed and what is open, and the Target Cost warning. Every figure opens to its Elements and sheets.
Project Summary
A synthetic example Project
The Priced BOQ against the Target Cost
Drawn: the measured part of the Priced BOQ, then the open part, an allowance until its Takeoff Step is confirmed; together they cross the Target Cost, and the page warns.
- Measured: from confirmed Elements
- Open: an allowance per sft of Gross Floor Area, marked, until its Takeoff Step is confirmed
Target Cost warning: the Priced BOQ crosses the Target Cost
Today
- Read from the drawing: the share of the Live Model read from the drawing, drawn as about three fifths
- Float to the next bank milestone: the time in hand before the next bank milestone, drawn as a bar ending at the milestone's level
Resolution inbox
- Slab panel S1 at 0'-6" on the new issue: accept its cost, +28.40 cft of RCCSign · Confirm · Send back · Delegate
- Rebar 20 mm, a quote 5 % over the Market Price: outside your Standing AuthoritySign · Confirm · Send back · Delegate
- Running Account bill: certify, up to what is builtSign · Confirm · Send back · Delegate
Cost by trade
Cost by floor
Board Pack
Frozen as issued
What you do
Open any figure to its drawer and on to its Elements and sheets. Set the Target Cost. Sign, confirm, send back or delegate each Resolution in the inbox. Take a Board Pack, frozen as issued.
- On the SummaryCost by trade: Concrete
- Its drawerThe Elements by storey, grid place and sheet: the typical floor’s slab panels, 966.37 cft, ৳3,23,540.68
- One ElementSlab panel S1, grids 4 to 5 and A to B: 70.99 cft
- Its line on the drawingThe panel’s edge on grid line A, threaded from its figure below
The Measurement Line
- Element
- Slab panel S1
- Nos
- 1
- L
- 14'-6"
- B
- 11'-9"
- H
- 0'-5"
- Quantity
- 70.99 cft
The figure is this plan’s own arithmetic.
What changes
You read your Project’s money, programme and risk on one page, and every figure is one click from its Elements and sheets. When the Priced BOQ crosses your Target Cost, the page warns you, even while the Takeoff is still in progress.
How it works
- 01
Today: the cash runway, the Estimate against the Target Cost, the float (the time in hand) to the next bank milestone, and the share of the Live Model read from the drawing.
- 02
Open any figure to its drawer, then on to its Elements in the Live Model and the sheets they were read from.
- 03
Set the Target Cost. The page warns when the Priced BOQ crosses it, even while the Takeoff is in progress.
- 04
Work the Resolution inbox: sign, confirm, send back or delegate each Resolution waiting.
- 05
Take a Board Pack for the board, frozen as issued.
Who uses it
What the Project Summary holds
- The total cost and the cost per sft.
- Cost by trade and by floor.
- What is confirmed and what is open.
- The Rebar, with its Rebar Basis.
- The latest Revision Comparison.
- The Live Model in 3D.
- The Target Cost warning.
The MD reads the Project Summary, sets the Target Cost and signs Resolutions; the MD never edits the Takeoff. Every figure on the page opens to its drawer, and from the drawer to its Elements and the sheets they were read from.
Questions
What is a Target Cost in Vextrus?
A Target Cost is a figure the MD sets for a Project in Vextrus. The Project Summary warns when the Priced BOQ crosses it, even while the Takeoff is still in progress. Guests never see it.
What is the Resolution inbox?
In Vextrus, the Resolution inbox on the Project Summary holds the Resolutions waiting for the MD. A Resolution is a Thread's signed outcome. The MD signs, confirms, sends back or delegates each one.
What is a Board Pack?
A Board Pack is what the MD takes from the Project Summary to the board, frozen as issued, so the figures the board saw stay as they were. The cost figure the MD takes to the board is the Issued Estimate, frozen with an issue number and date, which later changes are compared against.
Does the Project Summary show figures that are still open?
Yes, and the Project Summary says which. It shows what is confirmed and what is open, and the share of the Live Model read from the drawing, so the MD sees how firm each figure is. The Target Cost warning works even while the Takeoff is still in progress.
What do Guests see on the Project Summary?
Guests, people from outside the Developer invited by name, see quantities only on the Project Summary: no Estimate, no Target Cost, no Resolutions and no money. Vextrus shows a Guest no money in any view, drawer, tooltip or export.
Send us a drawing set. See every number traced.
Drawn once. Every number traced.