What decides a building's cost?

A building’s cost is decided by its own quantities and the prices paid for them: the concrete, Rebar, brickwork and finishes its drawings show, priced item by item. A figure per sft is an average, not your building. Vextrus prices the building from its own drawings, at your Market Prices, every quantity traced to its line.

Published 4 min read
The Demo building's Live Model separated into its storeys, one storey's Elements lit.

What makes one building cost more than another?

One building costs more than another because it holds more work, or dearer work, or both. The quantities come from its drawings: its foundation, its frame, its walls, its finishes, its services and its site. The prices come from what you pay: your materials, your labour contracts, and the layers that turn direct cost into the Estimate.

Each of those moves on its own. A soft site needs longer piles. A taller building needs heavier columns at its base. A plan with many internal walls carries more brickwork and more plaster per floor than an open one. A Developer’s choice of finishes moves the cost too. On the price side, cement, Rebar, sand and bricks are bought at that day’s prices; the labour is let per unit of each contractor’s scope; and preliminaries and site overheads, contingency and taxes sit on top. None of this is visible in a single figure.

The Measurement Sheet

A synthetic example: the slabs of the plan

RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)

The Measurement Sheet: A synthetic example: the slabs of the plan. RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)
ElementNosLBHQuantity (cft)
Slab panel S14-5/A-B, 4-5/C-D214'-6"11'-9"0'-5"141.98
Slab panel S22-3/A-B, 2-3/C-D, 3-4/A-B, 3-4/C-D413'-6"11'-9"0'-5"264.38
Slab panel S31-2/A-B, 1-2/C-D, 5-6/A-B, 5-6/C-D412'-0"11'-9"0'-5"235.00
Slab panel S42-3/B-C113'-6"15'-0"0'-5"84.38
Slab panel S51-2/B-C, 5-6/B-C212'-0"15'-0"0'-5"150.00
Slab panel S64-5/B-C114'-6"15'-0"0'-5"90.63
Stair and lift core: no slab (measured with the stair)3-4/B-C0.00
Total966.37
Slab panels grid to grid; every beam measured below the slab; the perimeter beams’ outer half, outside the grid line, full depth; the stair and lift core left out.

Why is a cost per sft only an average?

A cost per sft is the total divided by the floor area, so it tells you what an average square foot cost on some other building, not what yours costs. Two buildings of the same area can differ in their foundations, their storeys, their structure and their finishes, and so in their cost.

A figure per sft is useful once your own building has been priced: it lets you compare one design against another, or one floor against the next. Used before the drawings are measured, it hides exactly the things that decide the cost. That is why the honest answer to “what does a six-storey building cost?” is a question back: which building, on which drawings, at which prices?

Why do building budgets overrun?

A building budget overruns when the final cost moves past the figure that was set. A 2026 preprint by Flyvbjerg, Budzier and Christodoulou, on 186 building projects, measured how far actual costs travelled from their budgets, in real terms.

For a Developer’s own building, the places a cost can move are plain: the drawings, the prices, the bills, and a first figure that was never the building’s own. Each leaves a trace a Developer can watch. A Revision changes quantities; a price changes rates; a bill claims work. In Vextrus a Revision’s cost is split into quantity effect and price effect before anyone builds it, and nothing is priced until your QS confirms it. A Market Price is changed in one place, and every rate and amount follows. A running bill is paid only up to what the building shows is built, and a person signs it. The Project Summary warns when the Priced BOQ crosses the Target Cost, even while the Takeoff is in progress.

+58%

In a 186-project sample, buildings averaged 58% over budget in real terms.

Source: Flyvbjerg, Budzier & Christodoulou, arXiv 2606.15757 (preprint), 2026 · 186 building projects; preprint

What decides the cost of the foundation?

The cost of the foundation is decided by the structural drawings and the site. First come the earthwork in excavation, the sand filling, the soling and the CC beneath. Then come the piles, by number, size and length, with their pile caps and tie beams, or a mat (raft) by its area and depth, and the column bases: each with its own concrete, Rebar and labour, measured from its own detail. A basement adds its deep excavation and the shore piling that holds its sides.

In Vextrus the foundation is measured first, in building order: the grid and storeys, then the foundations and substructure, then the columns and walls they carry. Each pile, cap and tie beam is an Element with its Measurement Lines and its Trace, so its cost in the Priced BOQ opens the very lines it was measured from. The Construction Stages follow the same order: piling, then substructure, then each floor’s slab casting.

What does Bangladesh’s public-sector record show?

One study of Bangladesh’s public projects shows how far a final figure can move from the first. Rahman and colleagues (Bangladesh Journal of Administration and Management, 2020) took public infrastructure projects that four agencies completed in one financial year and compared each project’s final cost and time with its plan; on average, both ran over. These are public works, not Developers’ buildings, and the study says nothing about private housing.

+38% cost / +90% time

In 92 public projects in Bangladesh: 38% over budget, 90% over time, on average.

Source: Rahman et al., Bangladesh Journal of Administration and Management, 2020 (pub. 2022) · public-sector infrastructure, completed FY2016-17

How does Vextrus price a building?

Vextrus prices a building from its own drawings. The QS confirms the Live Model, every Element measured from the Drawing Set; the Priced BOQ prices each BOQ Item, its quantity the sum of its Measurement Lines and its rate from its Rate Analysis at your Market Prices; and the Estimate adds its layers, each shown and editable.

Beside each working rate stands the Benchmark Rate, the PWD Schedule of Rates rate as printed and net of PWD’s mark-ups, so every rate can be read against a public reference. Every figure keeps its Trace: from the MD’s number to its own line on the drawing is three clicks. Issued by a Signature, the Estimate is frozen as an Issued Estimate, and Cost (5D) cuts the Budget from it and tracks the money against what is built. See Vextrus for the MD, the Priced BOQ, Cost (5D) and the markets Vextrus works in.

See every article on the Learn page, or read what a BOQ is.

Questions

What decides the cost of a pile foundation?

A pile foundation's cost is decided by its own quantities, read from the structural drawings: the number of piles, their diameter and length, the pile caps and the tie beams, each with its concrete and its Rebar, priced at your Market Prices and your contract rates. In Vextrus each pile, cap and tie beam is an Element, measured and traced to its line.

What layers make up a building's Estimate?

In Vextrus the Estimate is the Priced BOQ's direct cost plus preliminaries and site overheads, contingency and taxes, each layer shown and editable by the Developer. Issued by a Signature, it is frozen as an Issued Estimate: the figure the MD takes to the board, which every later change is compared against.

Does a drawing change change the cost?

Often it does. In Vextrus a Revision's new sheets are laid over the old, every changed Element is lit in 3D, and its effect on the Priced BOQ is split into quantity effect and price effect, in quantities and ৳. Nothing is priced until your QS confirms the change, so you see what it costs before it is built.