The Developer’s MD
Vextrus gives the Developer’s MD one confirmed Live Model of the building, read from the consultants’ 2D drawings.
Vextrus gives a Developer’s bank engineer a Guest’s view of the Building: invited by name, scoped to the Projects the Developer chooses, read-only. The bank engineer opens the Project Summary, the Live Model and the Priced BOQ, with quantities only, and checks the progress and the quantities behind each bank milestone against the building itself, never its money.

31.5% (all loans 30.6%)
Bangladesh banks: 31.5% of construction loans non-performing at end-2025 (all loans 30.6%).
A bank engineer is a Guest and never sees money: no amount, rate, Estimate, Target Cost or money control, in any view, drawer, tooltip or export.
When a bank lends to a Developer’s Project, its milestones follow the building’s progress, and the bank’s engineer follows that progress. In Vextrus the bank engineer is a Guest of the Developer: invited by name, read-only, and scoped to its Projects.
The MD’s Project Summary shows, under Today, the float to the next bank milestone: the time in hand. It sits beside the cash runway and the Estimate against the Target Cost: money a bank engineer never sees.
The bank sees quantities, and the Building’s progress on the Live Model. The Developer’s bank, land-owner and buyers can watch the building without ever seeing what it costs.
No. In Vextrus a bank engineer is a Guest, and Guests never see money: no amount, rate, Estimate, Target Cost or money control, in any view, drawer, tooltip or export. The bank engineer sees quantities and progress, never ৳.
On the Live Model. The Live Model can be coloured by progress, from the Element states the Site Engineer records, and a Guest sees the same Live Model as the Developer’s team, without money. The Project Summary and the Priced BOQ open with quantities only.
Yes. Any quantity in Vextrus opens the line on the drawing it came from: the Trace. A bank engineer reads the Priced BOQ’s quantities, without rates or amounts, and follows each one to its line on the sheet.
By the Developer, by name, into the Projects the Developer chooses. The invitation opens only for the email it was sent to. A bank engineer is read-only, time-bound where the Developer wants, and every action is under their own name.
It is the time in hand before the Project’s next bank milestone. The MD reads it on the Project Summary, under Today, beside the cash runway and the Estimate against the Target Cost. It is the MD’s figure, on the MD’s page.
Drawn once. Every number traced.