Vextrus for MEP engineers

What does Vextrus change for MEP engineers?

For MEP engineers, Vextrus takes the Electrical, Plumbing and Fire Disciplines into the Priced BOQ from their own drawings, never as a lump-sum allowance. Electrical is priced by the Point, as PWD prices it; plumbing and fire fixtures and equipment are counted; runs are priced by rule per point and per fixture, the rule named.

Synthetic plan
123456ABCDS3S5S3S2S4S2S2S2S1S6S1S3S5S312'-0"13'-6"13'-6"14'-6"12'-0"65'-6"11'-9"15'-0"11'-9"38'-6"

Today

  • Each MEP Discipline usually comes from its own consultant office, revised and received separately from the structure.
  • Dhaka MEP drawings draw pipe, conduit and cable runs schematically.

What changes

  1. Takeoff

    • The Drawing Set is sorted by Discipline and read in order: Structural first, then Architectural with it, then MEP and fire.
    • A Discipline with no drawings is a Question, never zero.
    • The QS can trace a missing MEP Element by hand on any sheet; it is real and counted, its basis inferred, its rule ‘traced by hand’.
  2. Live Model

    • Each Discipline is read into its own Discipline Part, sharing the Building’s storeys and grid. Element Relations link Elements across Parts, and when one end changes or disappears, a Question is raised.
  3. Priced BOQ

    • Every Discipline is in the Priced BOQ from its own drawings, never as a lump-sum allowance.
    • Electrical work is priced by the Point, as PWD prices it: a light, fan, socket or similar outlet.
    • Plumbing and fire fixtures and equipment are counted from their own drawings.
    • Runs, which Dhaka MEP drawings draw schematically, are priced by rule per point and per fixture, and the rule is named, as every figure not read from the drawing names the rule that made it.
  4. Revision

    • Each Discipline is revised on its own: a new issue of its drawings lies over the last, with its changed Elements lit.

The MEP engineers’ job

MEP engineers design and draw the Building’s Electrical, Plumbing and Fire Disciplines. No role in Vextrus carries their name: their work arrives as their Discipline’s drawings in the Developer’s Drawing Set, read into its own part of the one Live Model, and the consultants among them join the Project as Guests, invited by name and read-only.

Questions

How does Vextrus price the electrical work?

By the Point, the way PWD prices it. A Point is one electrical outlet, such as a light, fan or socket, with its switch-board box; the switch is priced apart. A Measurement Rule counts the Points on the electrical drawings, and the Priced BOQ prices each from its Rate Analysis.

How are pipe, conduit and cable runs priced?

A Run is a length of pipe, conduit, cable or duct between two points of a system. Dhaka MEP drawings draw runs schematically, so in Vextrus a run is priced by rule, per point and per fixture, and the Priced BOQ names the rule it used, as every figure not read from the drawing names the rule that made it.

What does the QS do with the MEP drawings?

The QS confirms them like every other Discipline. Vextrus sorts the Drawing Set by Discipline and reads Structural first, then Architectural with it, then MEP and fire. The QS confirms the set’s conventions and verifies the drafted Elements by exception; where an MEP Element is missing, the QS traces it by hand, and it counts, labelled traced by hand.

What happens when the MEP drawings are missing from the set?

A Discipline with no drawings is a Question in Vextrus, never zero. Coverage accounts for every sheet of the Drawing Set, so the gap shows, and an item only the consultant can answer goes to the RFI list. Nothing in the set is silently unread: the missing Discipline stays a Question, never a zero in the total.

Send us a drawing set. See every number traced.

Drawn once. Every number traced.