Vextrus for the QS

What does Vextrus change for the QS?

In Vextrus the QS, the quantity surveyor, no longer re-measures the whole drawing by hand. The QS confirms the Drawing Set’s conventions, the machine drafts the whole Live Model, and the QS verifies it by exception on the drawing. Code measures every quantity, and each has a measurement sheet behind it, every line opening its place on the drawing.

One beam in the Live Model turns from proposed to confirmed as the QS confirms it.

Today

  • The takeoff runs the old way: measure on the CAD drawing, key every figure into Excel, and build the BOQ by hand.
  • Software with a fixed BOQ format sends the work back to Excel anyway.
  • A Revision re-issues some of the sheets, and the latest Revision is the instruction: what it changed has to be found and priced before it is built.
  • Until its bars are read from the drawing, Rebar comes from a ratio: kg of Rebar per unit of concrete.
  • Questions for the consultant go out in chat messages, apart from the drawing they are about.

What changes

  1. Takeoff

    • Upload the whole Drawing Set once and confirm a few one-click convention cards; the machine drafts the whole model, and you verify it by exception on the drawing, type by type.
    • The four safeguards are in the screen: cross-checks shown before the Proposals, a blind spot-measure of a few items of each type, no blind bulk-accept, and a dedicated review mode.
    • Fix one Element and Vextrus offers the same fix to every similar Element, with the matching rule and the count; one act applies it, and it can be reverted.
    • You rule once per issue type, not once per Element: one ruling settles a whole group, with the Elements it releases.
    • Every assumption is a visible Rule Set parameter (laps, Wastage, the slab-beam overlap, rounding, deductions), starting from a copy of the Bangladeshi default set, based on PWD practice.
    • Items only the consultant can answer go to the RFI list, one Thread per item; until the answer comes, a provisional value is labelled inferred, never passed off as read.
    • A Developer without a QS team uses the done-for-you service: Vextrus’s QSs run the Takeoff on the same Workbench, held to the same safeguards, and a named Vextrus QS signs the Issued Estimate. With you on the team, your first Takeoff on Vextrus can be done with you, a Vextrus Engineer beside you.

    82% → 46%

    With a wrong AI suggestion, very experienced radiologists fell from 82% to 46%.

    Source: Dratsch et al., Radiology, 2023 · radiology, not construction; simulated AI
    Fixing one beam offers the same fix to every similar beam, lit across the storeys.
  2. Trace

    • Every quantity has a measurement sheet behind it, in the form a QS already signs: No. × L × B × H, the quantity in its unit, the deductions named, each line opening its place on the drawing.

    The Measurement Sheet

    A synthetic example: the slabs of one floor

    RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)

    The Measurement Sheet: A synthetic example: the slabs of one floor. RCC 1:1.5:3 in suspended floor slab, 5" thick (cft)
    ElementNosLBHQuantity (cft)
    Slab panel S14-5/A-B, 4-5/C-D214'-6"11'-9"0'-5"141.98
    Slab panel S22-3/A-B, 2-3/C-D, 3-4/A-B, 3-4/C-D413'-6"11'-9"0'-5"264.38
    Slab panel S31-2/A-B, 1-2/C-D, 5-6/A-B, 5-6/C-D412'-0"11'-9"0'-5"235.00
    Slab panel S42-3/B-C113'-6"15'-0"0'-5"84.38
    Slab panel S51-2/B-C, 5-6/B-C212'-0"15'-0"0'-5"150.00
    Slab panel S64-5/B-C114'-6"15'-0"0'-5"90.63
    Stair and lift core: no slab (measured with the stair)3-4/B-C0.00
    Total966.37
    Slab panels grid to grid; every beam measured below the slab; the perimeter beams’ outer half, outside the grid line, full depth; the stair and lift core left out.
  3. The AI

    • Code computes every number, and every figure not read from the drawing names the rule that made it.
  4. Priced BOQ

    • Each rate comes from its Rate Analysis at the Developer’s Market Prices, with the Benchmark Rate beside it; change a price once and every rate follows, while Issued Estimates keep the prices they were issued on.
    • Every Discipline is in the Priced BOQ from its own drawings, never as a lump-sum allowance: electrical by the Point, fixtures and equipment counted, runs priced by rule per point and per fixture, the rule named.
    • The Priced BOQ exports to Excel with live formulas, and its columns are added and removed like Excel, so no format locks you in.
  5. Revision

    • A Revision lays the new sheet over the old and lights the changed Elements; you confirm every moved pair, and no money carries across it until then.
  6. Rebar

    • Every Rebar figure carries its Rebar Basis: a figure by ratio says it is a Rebar Ratio estimate until the bars are read from the drawing.
  7. Cost (5D)

    • You certify Running Account bills, as the MD does, each claim checked against the Elements built.

The QS’s job

The QS (the quantity surveyor, or estimation engineer) measures quantities from the drawings and prices them, at the Developer or working for it, and is Vextrus’s first daily user. In Vextrus the QS confirms the Drawing Set’s conventions, verifies the drafted model by exception, rules once per issue type, prices the Priced BOQ and issues the Estimate with a Signature.

Read what a QS does, from the measurement sheet to the Priced BOQ.

Questions

How do you do quantity surveying of a construction project?

A QS measures every quantity from the drawings and prices it. In Vextrus the QS confirms the Drawing Set’s conventions, the machine drafts the Live Model, and the QS verifies it by exception, type by type. Code measures each quantity onto its measurement sheet, and the Priced BOQ prices it from its Rate Analysis at the Developer’s Market Prices.

Does Vextrus replace the QS?

No. The machine proposes, the engine measures, the QS confirms. A Proposal counts toward nothing until the QS confirms it, and the QS always confirms the set’s conventions. What Vextrus removes is re-measuring the whole drawing by hand: the QS looks at the doubtful lines and rules on them, and a type is accepted only after its checks pass.

Why does the QS still check what the machine drafts?

Because people follow wrong machine suggestions, experts included, and training does not stop it. So Vextrus puts the safeguards in the screen: cross-checks first, a blind spot-measure of a few items of each type, no blind bulk-accept, and a dedicated review mode. A type is accepted only when its checks pass and its exceptions are settled.

Does Vextrus measure the way a Dhaka QS does?

Vextrus works in a Dhaka QS’s units and rules. The Rule Set starts as a copy of the Bangladeshi default set, based on PWD practice, edited to the Developer’s habits. Quantities are in cft, sft, rft, nos, kg and ton, bag and LS, metric one switch away; the measurement sheet reads No. × L × B × H, the deductions named.

What does the Developer’s QS do under the done-for-you service?

Checks what we deliver, where the Developer has a QS. The service is for Developers without a QS team: Vextrus’s own QSs run the Takeoff on the same Workbench, held to the same safeguards and measured the same way, and a named Vextrus QS signs the Issued Estimate for the MD or engineer to accept. Every figure opens its measurement sheet and its Trace, so any line can be checked. A Developer with a QS can start on the software instead, done with you.

Send us a drawing set. See every number traced.

Drawn once. Every number traced.