Vextrus for the structural engineer

What does Vextrus change for the structural engineer?

Vextrus gives the Developer’s structural engineer a bar bending schedule built from the drawing’s callouts, with laps and hooks by rule where the drawing is silent and every bar checked against BNBC 2020, to sign before a bar is cut. Vextrus reads, checks and flags; it does not design. A later edit marks the signed BBS Stale.

One beam of the Live Model, close up: the Element that hosts the bars on its bar bending schedule.

Today

  • Every bar on a bar bending schedule has to be checked against the drawing and BNBC 2020 before it is signed.
  • When a Revision changes a member, its signed bar bending schedule no longer matches the drawing.
  • Before each pour, its Hold Points have to clear and a Pour Release has to be signed.
  • Questions about a member go out in chat messages, apart from the drawing they are about.

~21%

Counting hidden costs, error is estimated at about a fifth of UK construction spend.

Source: Get It Right Initiative, Research Report, 2016 · UK; expert estimate

What changes

  1. Rebar

    • Bars are read from the drawing’s callouts; laps, hooks and anchorage are worked by rule where the drawing is silent, and every Rebar figure shows its Rebar Basis.
    • The code audit checks every bar on the BBS against BNBC 2020, other codes only where BNBC is silent. Vextrus reads, checks and flags; it does not design. The engineer signs.
    • Each member’s cage opens in 3D, every bar opening its callout on the drawing; the BBS gives its shape codes, laps and cut lengths, with a cutting plan behind it.
    • The Board totals the Rebar in ton by Storey Band and diameter, reconciled to the BBS.
    • You sign the BBS before a bar is cut. A later edit marks it Stale, and if the drawing changes, the schedule says so before anyone buys.
    Synthetic section, depths not to scale
    BA11'-9"L/4 2'-11¼"L/7 1'-8⅛"5"1'-6"Slab panel S1, 0'-5"1Alternate bars cranked2Extra top bars10 mm @ 12" c/c3Bottom 10 mm @ 6" c/cboth ways4Beam 10" x 1'-6"5
    1. Slab panel S1, 0'-5"
    2. Alternate bars cranked
    3. Extra top bars, 10 mm @ 12" c/c
    4. Bottom 10 mm @ 6" c/c, both ways
    5. Beam 10" x 1'-6"
  2. Revision

    • A Revision lays the new sheet over the old and lights the changed Elements in 3D, and the QS confirms every moved pair.
  3. Schedule (4D)

    • Each pour shows the Hold Points still open and waits for a signed Pour Release.
  4. Collaboration

    • A question from site is asked on the column itself; you answer in its Thread, and the Thread closes as a Resolution signed by its assigned signer.

The structural engineer’s job

The Developer’s structural engineer signs the bar bending schedule (BBS) and answers the technical questions the site and the QS raise. In Vextrus the structural engineer is a team role: each BBS waits for that Signature, and a question asked on a column is answered on that column, in its Thread. The design stays the structural consultant’s, on the drawing.

Read how Rebar is counted from a structural drawing: callouts, laps, hooks and the bar bending schedule.

Questions

Should a column take 12 mm or 16 mm Rebar?

That is the structural design, and it is on the drawing. Vextrus does not design the Rebar: it reads each bar’s diameter from the drawing’s callouts, checks every bar on the BBS against BNBC 2020, and flags what does not agree, for the structural engineer, who signs the BBS. The size is the structural consultant’s call.

What does the structural engineer sign in Vextrus?

The bar bending schedule. Each BBS lists its bars with their shape codes, laps and cut lengths, every figure with its Rebar Basis and every bar checked against BNBC 2020. Only the assigned signer can sign it. An edit after signing marks the BBS Stale, and the schedule says so before anyone buys.

Can I see a member’s bars in 3D?

Yes. Open a beam or a column in Vextrus and its cage shows in 3D, each bar opening the callout on the drawing it was read from. Beside it, the BBS gives each bar’s shape code, lap and cut length, and the Board totals the Rebar in ton by Storey Band and diameter, reconciled to the BBS.

What does checked against BNBC 2020 mean?

Vextrus’s code audit checks every bar on the BBS against the Bangladesh National Building Code 2020, and other codes only where BNBC is silent. It flags what does not agree for the engineer. It is a check, not an approval: the design stays on the drawing, and the Signature on the BBS is the engineer’s.

Send us a drawing set. See every number traced.

Drawn once. Every number traced.