Vextrus for the planner

What does Vextrus change for the planner?

Vextrus puts the plan on the Elements of the Live Model: dated Activities, with pours as the spine. The Planner generates the plan over the Project calendar; each pour waits on its Hold Points until an engineer signs the Pour Release, and a Revision shows on the plan as Revision pending until the QS confirms it.

The Building in the Live Model, its pours changing colour one by one in the order they are cast.

Today

  • Each slab’s pour waits on its Hold Points and a signed Pour Release.
  • When drawings are re-issued, the latest Revision is the instruction, and the plan has to follow it.
  • Everything is disconnected: the plan, the drawings and the BOQ sit in different files.

42% late

Next door in India, 779 of 1,873 central-government projects were running late.

Source: Government of India, MoSPI, monthly summary to Cabinet, May 2024 · India, central-government projects, March 2024

What changes

  1. Schedule (4D)

    • The Planner generates the plan over the Project calendar: dated Activities, each on the set of Elements it works on, with pours as the spine and the Construction Stages in their order, overlapping where the work allows.
    • The Gantt shows the critical path, the chain of Activities where any one finishing late moves the finish date. Click a bar and its Elements light in the Live Model.
    • Each pour carries its Hold Points, and an engineer signs the Pour Release only when they clear, so the plan shows which pour is not ready before the concrete is booked.
    • Drag the as-of date and the Building rises, pour by pour. Each Construction Stage shows its Element count, and what is built is the Site Engineer’s Record on each Element.
    Synthetic elevation
    123456Ground±0'-0"1st floor+10'-0"2nd floor+20'-0"3rd floor+30'-0"4th floor+40'-0"5th floor+50'-0"6th floor+60'-0"Roof+70'-0"
  2. Revision

    • When a Revision changes Elements that an Activity works on, the plan shows Revision pending until the QS confirms the change, and the changed Elements light in 3D.
  3. Collaboration

    • A question that holds a pour is asked on the Element it is about, as a Thread, and closes as a signed Resolution, one line in the Journal.
  4. Materials

    • Materials reads each pour’s needs by Resource, Construction Stage and week, so Procurement buys against the same pours the plan holds.
  5. Cost (5D)

    • In Cost (5D) the cash trough, the Project’s lowest cash point, moves with the plan, and Earned Value sets the work done against the work planned.

Who sees money

Team roles see ৳ by Construction Stage in Schedule (4D). Buyers see progress only, never ৳.

Questions

How does the plan show progress in Vextrus?

From the Elements. Drag the as-of date and the Building rises, pour by pour; each Construction Stage shows its Element count; and what is built is the Site Engineer’s Record on each Element, a named person’s record. In Cost (5D), Earned Value then sets the work done against the work planned by the same date.

Does a new drawing issue change the plan?

It shows on the plan. Each Activity sits on the Elements it works on, so when a Revision changes those Elements, the plan shows Revision pending until the QS confirms the change, and the changed Elements light in 3D. No money carries across the Revision until the QS confirms it.

Can the plan show when the next slab can be poured?

It shows what the pour is waiting on. Each pour carries its Hold Points, and an engineer signs the Pour Release only when every one has cleared, so the Planner, the site and the MD see which pour is not ready before the concrete is booked.

How does the plan connect to buying materials?

Through the same Elements. Materials reads each pour’s needs by Resource, Construction Stage and week from the Material Schedule, and a cell lights its Elements in the Live Model. Procurement buys those needs at the lowest landed cost, inside the MD’s Standing Authority.