Rebar: the bar bending schedule, read from the drawing and signed

What is Rebar in Vextrus?

Rebar in Vextrus turns the structural drawing's callouts into bars and a bar bending schedule (BBS), every bar checked against BNBC 2020, every figure with its Rebar Basis. Vextrus reads, checks and flags; it does not design. The engineer signs. A later edit marks the signed BBS Stale.

One beam of the Live Model, close up: the Element whose bars the BBS schedules.

What you do

The QS (or the Developer's engineer) reads the Board, opens a beam's or a column's cage and its BBS, runs the cutting plan and the code audit, then sends the BBS to the Structural Engineer to sign.

Synthetic section, depths not to scale
BA11'-9"L/4 2'-11¼"L/7 1'-8⅛"5"1'-6"Slab panel S1, 0'-5"1Alternate bars cranked2Extra top bars10 mm @ 12" c/c3Bottom 10 mm @ 6" c/cboth ways4Beam 10" x 1'-6"5
  1. Slab panel S1, 0'-5"
  2. Alternate bars cranked
  3. Extra top bars, 10 mm @ 12" c/c
  4. Bottom 10 mm @ 6" c/c, both ways
  5. Beam 10" x 1'-6"

What changes

Your Structural Engineer signs the BBS, and a later edit marks the signed BBS Stale: the schedule says so before anyone buys Rebar.

How it works

  1. Until an Element’s bars are read, its Rebar is a Rebar Ratio estimate, kg of Rebar per cft of concrete (per m³ in metric), and it says “by ratio”.

  2. Bars are read from the structural drawing’s callouts. Where the drawing is silent, laps, hooks and anchorage are worked by rule, and the figure says “from the drawing + rules”.

  3. The BBS lists each Element’s bars with their shape codes, laps and cut lengths; its Parameters, the settings it is worked with, sit beside it.

  4. An Element’s cage opens in 3D; click a bar and its callout opens on the drawing.

  5. The Board totals the Rebar in ton by Storey Band and diameter, reconciled to the BBS.

  6. A cutting plan sets out how the bars are cut.

  7. The code audit checks every bar on the BBS against BNBC 2020, other codes only where BNBC is silent, and flags what it finds.

  8. The Structural Engineer reviews the BBS and signs it.

  9. A later edit, such as a Revision that changes a beam, marks the signed BBS Stale: a new Signature is required.

Bar bending schedule (BBS)

Demo building · a demonstration project

F.B-10 at C-D/4 · 5th floor, 12" × 24" · fy 72,500 psi

Rebar Basis from the drawing + rules

The BBS for F.B-10 at C-D/4 · 5th floor, an excerpt
BarDiaShapeNosLength (mm)Total (m)kg
Top20 mm0024,5959.19022.66
Bottom20 mm0034,59513.78534.00
Stirrups, end zones: 13 each @ 4"10 mm51261,72044.72027.57
Stirrups, middle: 10 @ 7"10 mm51101,72017.20010.60

kg = Total × unit weight: 20 mm 2.4662 kg/m · 10 mm 0.6165 kg/m (nominal mass)

Stirrups: shape 51, A 229 × B 533 mm (1½" cover), 135° hooks

Main bars straight (shape 00); their lap and anchorage rows: by rule, not in this excerpt

Checked against BNBC 2020

Signed by the Structural Engineer

Stale if a later Revision changes this beam: a new Signature is required

A BBS in Vextrus for one beam of the Demo building: each bar’s diameter, shape code, length (cut length for the stirrups), number and kg, the set’s Rebar Basis “from the drawing + rules”, and the Structural Engineer’s Signature.

Who uses it

Only the QS and the MD see ৳ in Rebar. The Structural Engineer signs the BBS. Rebar is closed to Guests.

Questions

Where do the bars on a Vextrus BBS come from?

From the structural drawing's callouts. Vextrus reads the bars from them and works laps, hooks and anchorage by rule where the drawing is silent. The BBS then lists the bars Element by Element, with shape codes, laps, cut lengths, numbers and kg, and every figure shows its Rebar Basis. The Board totals the Rebar in ton by Storey Band and diameter.

How many kg of Rebar does a roof slab with beams need?

The building's own drawings decide it, so there is no one figure for every roof. Before the bars are read, a figure "by ratio" comes from a Rebar Ratio, kg of Rebar per cft of concrete from Vextrus's defaults or your QS, and says so. Once the bars are read, the BBS gives the kg bar by bar, marked "from the drawing" or "from the drawing + rules".

How many bars go in a column, and how many kg of Rebar?

The number and size of a column's bars are the structural consultant's design, shown on the drawing; Vextrus reads them and does not design them. From what it reads, the BBS gives each column's bars, cut lengths and kg, and the Board totals the Rebar in ton by Storey Band, the storeys over which a column keeps one size, and by diameter.

What is a bar bending schedule (BBS)?

A bar bending schedule (BBS) lists the bars of each structural Element: diameter, shape code, cut length, number and weight, with laps and anchorage. In Vextrus the BBS is built from the drawing's callouts, every bar on it is checked against BNBC 2020, and the Structural Engineer signs it.

Does Vextrus design the Rebar?

No. Vextrus reads, checks and flags; it does not design. The engineer signs. The design is the structural consultant's, on the drawing. Vextrus reads the bars from the callouts, its code audit checks every bar on the BBS against BNBC 2020, other codes only where BNBC is silent, and the Structural Engineer signs the schedule.

What happens to a signed BBS when the drawing changes?

An edit after signing marks the BBS Stale, and a new Signature is required. When a Revision changes a beam or a column, its BBS says so before anyone buys Rebar against it; the Structural Engineer reviews the changed rows and signs again.

Send us a drawing set. See every number traced.

Drawn once. Every number traced.