Materials: each pour's needs at the lowest landed cost
What is Materials in Vextrus?
Materials in Vextrus is where Procurement buys each pour's needs at the lowest landed cost, inside the MD's Standing Authority. It works from the Material Schedule: the cement, sand, stone chips, Rebar and bricks the Building needs, by floor and by Construction Stage, derived from the same takeoff as the Priced BOQ.

What you do
Open a pour's needs by Resource, Construction Stage and week, raise a requisition, send an RFQ to dealers by link, and accept the quote with the lowest landed cost: the Purchase Order goes out inside the Standing Authority, or waits for the MD's Signature.
RFQ · Rebar 20 mm
Demo building · a demonstration project
Requisition: 1.5 t of 20 mm Rebar for the 5th floor pour Grade fy 72,500 psi (500 MPa), from the general notes Rebar Basis from the drawing + rules
| Dealer and terms (per ton) | Quoted price per ton (৳) | Landed cost per ton (৳) |
|---|---|---|
| Dealer B45 days' credit · transport ৳600 · unloading ৳300 | 86,100 | 87,000 |
| Dealer Acash against delivery · transport ৳650 · unloading ৳300 · night surcharge ৳1,400 | 84,800 | 87,150 |
| Dealer C30 days' credit · delivery included · unloading ৳300 · 5 % over the Market Price, outside the Standing Authority | 91,350 | 91,650 |
Landed cost per ton = quoted price + transport + unloading + any night surcharge: the price delivered to site
Purchase Order · inside the Standing Authority
Dealer B · 1.5093 t (51 bars of 12 m at 2.4662 kg/m) × ৳86,100 = ৳1,29,951
Transport and unloading 1.5093 t × ৳900 = ৳1,358 · landed ৳1,31,309
45 days' credit
Standing Authority, set by the MD: a panel dealer · within 3 % of the Market Price (৳87,000 a ton) · under ৳5 lakh a Purchase Order
What changes
The cheapest quote is not always the cheapest price delivered. Vextrus ranks quotes by landed cost and asks you only about orders outside your limits.
How it works
The Material Schedule comes from the same takeoff as the Priced BOQ: each BOQ Item’s Rate Analysis applied to its Measurement Lines, by floor and by Construction Stage, with Rebar by diameter.
Wastage for cutting, breakage and spillage is added here, to what you buy, and never to a BOQ quantity, which is measured net.
Needs show by Resource, Construction Stage and week; click a cell and its Elements light in the Live Model.
Procurement drafts a pour’s needs into a requisition.
An RFQ goes to dealers by link.
The quotes rank by landed cost, the price delivered to site, not the price on the quote.
Accepting the lowest landed cost raises the Purchase Order. Inside the Standing Authority it goes out; outside it, the MD signs.
Who uses it
Team roles see ৳ in Materials. The MD signs any order outside the Standing Authority. Materials is closed to Guests.
Questions
What is material takeoff?
Material takeoff works out the quantities of materials a building needs. In Vextrus it is the Material Schedule: the cement, sand, stone chips, Rebar by diameter, bricks and the like, by floor and by Construction Stage, derived from the same takeoff as the Priced BOQ, so what you buy and what you price come from one set of quantities.
How do you do a material takeoff from drawings?
In Vextrus there is no second count. The QS confirms the Live Model from the drawings once. Each BOQ Item's Rate Analysis gives the Resources it uses per unit, applied to its Measurement Lines, with Wastage added for what to buy. The Material Schedule follows by floor and by Construction Stage, and a cell lights the Elements behind it.
What is landed cost?
Landed cost is what a Resource costs delivered to site, not the price on the quote. Vextrus ranks every quote on a requisition by landed cost, so the cheapest quote on paper is not always first, and the Purchase Order goes to the lowest landed cost, inside the MD's Standing Authority.
Who signs a Purchase Order?
The MD, in advance or one by one. A Purchase Order inside the MD's Standing Authority, the limits the MD signs beforehand, goes out when Procurement accepts the quote. An order outside those limits waits for the MD's Signature. A person accepts every quote.
Is Wastage part of the BOQ quantity?
No. Wastage, the allowance for cutting, breakage and spillage, is added to a Resource's quantity in its Rate Analysis and enters the Material Schedule, what you buy. A BOQ quantity stays measured net, to the drawing, so the Priced BOQ and the Material Schedule each say what they mean.
Send us a drawing set. See every number traced.
Drawn once. Every number traced.