One database for a building: the idea, and where the 2D drawing fits

The idea of one database as the record of a building is old: a research report proposed it in 1974, and Building Information Modelling (BIM) promised it in 2002. Vextrus starts from what a Developer already has, the 2D drawing set, and reads it once into one confirmed Live Model that every module works from.

Published 4 min read

1974 (52 years before 2026)

1974: a research report proposed one database as the description of record of a building, with drawings generated from it.

Source: Carnegie-Mellon University, Institute of Physical Planning (Eastman et al.), An Outline of the Building Description System (Research Report No. 50), 1974 · a university progress report on a research prototype; not a product or industry practice

2002

2002: 'Building Information Modeling' promised coordinated data through design, construction and operation.

Source: Autodesk, Building Information Modeling (white paper), 2002 · a vendor white paper; the idea is older
One column on the Demo building's drawing, pulling out to the finished Building at dusk: the same Element from the drawing to handover.

What was the idea of one database for a building?

The idea was to describe a building once, as data, and to make its drawings from that description, so that every drawing, schedule and quantity would agree because they came from one source. A research report from Carnegie-Mellon University (Eastman and colleagues, An Outline of the Building Description System) set out such a system; it was a university research prototype, not a product the industry used.

The problem it answered is the one a Developer still has. When each drawing, each list and each spreadsheet is made on its own, they drift apart. A change lands in one and not in another, and nobody can say which is right. One description of record would end the argument: there would be one building, and every document would be a view of it.

What did Building Information Modelling promise?

Building Information Modelling (BIM) promised coordinated data through design, construction and operation: one model of the building, authored in 3D, from which the drawings, schedules and quantities are taken. A software vendor’s white paper put the promise to the industry under that name; the idea itself is older than the name.

BIM authoring starts from the 3D model. The office models the building, and the drawings come out of the model. For a Developer whose consultants issue 2D drawings, that means a model has to be made first, by someone, before any of its data can be used, and kept in step with every Revision the consultants issue afterwards.

Why is the promise still open?

The promise is still open because a model made for one stage of a building and then left behind does not keep the record of the building’s whole life. A survey of RICS members (RICS, Digitalisation in construction report 2024) asked how consistently their organisations use BIM or digital twins for whole-life thinking across their projects, and few said they do so consistently on all of them.

Vextrus’s view is that a building’s data is still locked: in 2D drawings, sheet by sheet, or in 3D models that serve their own stage and stop there. BIM, for all its years, has not delivered its full potential to a Developer building from 2D drawings. The idea of one database was right. The starting point was the problem.

9%

Only 9% of respondents say their organisation consistently uses BIM or digital twins for whole-life thinking on all projects.

Source: RICS, Digitalisation in construction report 2024, 2024 · RICS Global Construction Monitor, Q4 2023; self-reported; about half UK and Ireland

Where does the 2D drawing fit?

The 2D drawing is where a Developer’s building already begins, so it is where Vextrus starts. The consultants issue the Drawing Set in 2D, and they keep drawing in 2D. Vextrus reads the whole set once into one confirmed Live Model, and every Element keeps its Trace to the line on the drawing it was read from.

The QS confirms the set’s own conventions, the machine drafts the whole model, and the QS verifies it by exception on the drawing. Nobody redraws the building in 3D first, and nobody asks the consultants to change how they work. The drawings stay the consultants’ own; the Live Model is the confirmed record read from them. See the Live Model in Vextrus.

Synthetic plan
123456ABCDS3S5S3S2S4S2S2S2S1S6S1S3S5S312'-0"13'-6"13'-6"14'-6"12'-0"65'-6"11'-9"15'-0"11'-9"38'-6"

How is the Live Model different from BIM?

The Live Model is read from the drawings, not authored in 3D, and it is a dataset of confirmed Elements, not a design model. Each Element has a stable identity, its geometry, its Trace and its basis, and keeps that identity across Revisions and through its three Life Phases: As designed, As built and As maintained.

Every Discipline goes into the same model: each Discipline’s drawings into its own Discipline Part, sharing the building’s storeys and grid. Vextrus never calls the Live Model BIM, because it is not made the way BIM is made, and it does not stop where a design model stops.

What does one database change for a Developer?

One database means every team works from the same building. The Priced BOQ, Rebar, the Schedule (4D), Materials, Cost (5D), Revisions, collaboration and handover all read the same confirmed Elements, so a figure in any of them opens the line on the drawing it came from. At handover, the Live Model goes with the building.

A Revision shows what that means day to day. The new sheets are laid over the old, every changed Element lights up in 3D, its cost is split into quantity effect and price effect, and “Revision pending” shows on every module until the QS confirms the change. A signed BBS the change touches goes stale. Nobody has to tell each team separately.

The record then carries on. Once the building’s own data flows back into it, the Live Model becomes the building’s Digital Twin, on the same Elements that were read from the drawing. That is why Vextrus is the Drawing-to-Handover platform for real-estate Developers, and not an ERP or a BIM tool. See why Vextrus is neither, or how the same model drives the Schedule (4D) and Cost (5D).

See every article on the Learn page, or read what a digital twin of a building is.

Questions

What is the difference between 2D CAD and BIM?

2D CAD describes a building in lines on sheets: plans, sections and details, each drawn as its own sheet. BIM authoring describes it as a 3D model from which the sheets are drawn. Vextrus starts from the first: it reads the 2D sheets into one confirmed Live Model that every module works from, without redrawing the building in 3D.

Does every Discipline go into the same model?

Yes. In Vextrus each Discipline's drawings, structural, architectural, electrical, plumbing, fire and the rest, are read into their own Discipline Part, sharing the building's storeys and grid. Element Relations link Elements across the Parts, such as a column on the architectural plans that is the same thing as a column on the structural plans, and when one end changes or disappears, a Question is raised.

What does one database mean in Vextrus?

It means the building is held as one dataset of confirmed Elements, each with a stable identity, its geometry, its Trace and its basis. The Priced BOQ, the Material Schedule, the 3D, Rebar, the Schedule (4D), Materials, Cost (5D) and every later module are readings of it: one database for the building's whole life, handover included.